1 FINAL EVALUATION Angola Thematic window Democratic Economic Governance Programme Title: Governance of Water and Sanitation in Angola s poor Neighbourhoods Author: Carlos Carravilla, consultant March 2013

2 Prologue This final evaluation report has been coordinated by the MDG Achievement Fund joint programme in an effort to assess results at the completion point of the programme. As stipulated in the monitoring and evaluation strategy of the Fund, all 130 programmes, in 8 thematic windows, are required to commission and finance an independent final evaluation, in addition to the programme s mid-term evaluation. Each final evaluation has been commissioned by the UN Resident Coordinator s Office (RCO) in the respective programme country. The MDG-F Secretariat has provided guidance and quality assurance to the country team in the evaluation process, including through the review of the TORs and the evaluation reports. All final evaluations are expected to be conducted in line with the OECD Development Assistant Committee (DAC) Evaluation Network Quality Standards for Development Evaluation, and the United Nations Evaluation Group (UNEG) Standards for Evaluation in the UN System. Final evaluations are summative in nature and seek to measure to what extent the joint programme has fully implemented its activities, delivered outputs and attained outcomes. They also generate substantive evidence-based knowledge on each of the MDG-F thematic windows by identifying best practices and lessons learned to be carried forward to other development interventions and policy-making at local, national, and global levels. We thank the UN Resident Coordinator and their respective coordination office, as well as the joint programme team for their efforts in undertaking this final evaluation. MDG-F Secretariat The analysis and recommendations of this evaluation are those of the evaluator and do not necessarily reflect the views of the Joint Programme or MDG-F Secretariat.

3 Final evaluation of the Joint Programme: Governance of Water and Sanitation in Angola s poor Neighbourhoods (MDGF-1830) FINAL REPORT Prepared by: Carlos Carravilla 1

4 Executive summary 4 Introduction 8 Background 8 Goals and methodology of evaluation 9 Description of the joint programme and the work context 12 Findings by level of analysis and information needs 17 Design level 17 Relevance 17 Process level 27 Efficiency 27 Ownership in the process 36 Results level 40 Effectiveness 40 Sustainability 44 Conclusions 48 Good practices, success stories and lessons learned 55 Recommendations 56 Table 1. Reshaped Results Framework 15 Table 2. Budget modification after UNRCO closed operations in Angola 18 Table 3. Modification of the Outcome OVIs 19 Table 4. Contribution of the JP WatSan to the MDGs 21 Table 5. Beneficiaries count 40 Figure 1. Location of the programme 16 Figure 2. Charts and figures as of 31 December Figure 3. Charts and figures as of 31 December Annexes Annex 1. Evaluation matrix Annex 2. Interviews and FGDs guides Annex 3. Monitoring Framework assessment Annex 4. Quadro de Monitoria do Programa March 2013 Annex 5. UNDP MDG-F Media Development project Annex 6. Improvement Plan-Final Status Annex 7. FGD and interviewees listing Annex 8. Evaluator s CV Annex 9. Evaluation Terms of Reference 2

5 CBOs CM DNAAS DPEA EA EPAL GAS HACT IFAL ILO INEFOP IOM MDG-F MINAMB MINEA MINPLAN MOGECA MDTF NGO NSC PMC SISAS STLC UNDP USAID UTNSA UNDAF UNHRO UNICEF WASH Community Based Organizations Comissão de Moradores Direção Nacional de Abastecimento de Água e Saneamento Direção Provincial de Energia e Águas Executivo Angolano Empresa Pública de Águas de Luanda Grupo Água e Saneamento Harmonized Cash Transfers Instituto de Formação da Administração Local International Labour Organization Instituto Nacional de Emprego e Formação Profissional International Organization for Migration Millennium Development Goals Achievement Fund Ministério do Ambiente Ministério de Energia e Águas Ministério do Planeamento Modelo de Gestão Comunitária de Água Multi Donor Trust Fund Non Governmental Organizations National Steering Committee Programme Management Committee Sistema de Informação do Sector de Água e Saneamento Saneamento Total Liderado pela Comunidade United Nations Development Programme United States Agency for International Development National Technical Unit for Sanitation Coordination United Nations Development Assistance Framework United Nations Human Rights Office United Nations Fund for Children Water, Sanitation & Hygiene 3

6 EXECUTIVE SUMMARY 1. This is an individual and final evaluation of the joint programme entitled Governance of Water and Sanitation in Angola s poor Neighbourhoods (MDGF-1830) (JP WatSan). The programme seeks to: (1) establish a pro-poor policy and regulatory framework that feature community participation in the provision and management of water and sanitation (WatSan) facilities; (2) promote the autonomy of communities in the management of WatSan facilities through the creation and/or strengthening of (i) Grupos de Água e Saneamento (GAS) in rural areas of Moxico Province and (ii) Comissões de Moradores in peri-urban bairros 1 of Luanda; (3) reinforce the capacity of local governments to effectively monitor community WatSan management systems, mobilize resources and fund community WatSan projects; and (4) put in place an enhanced accountability system for peri-urban and rural water and sanitation sector. 2. Angola s water supply and sanitation sector has until recently remained the least developed in Africa due to four decades of persistent civil conflict. Significant water supply and sanitation sector transformations began with the passage of Lei das Águas in 2002, which, together with the formation of the 2003 Water Sector Development Strategy 2 and Water Sector Programme 3, define the policy framework for water resources management and sets the foundation for the national policy for the use of water as consumption good. 3. The programme was approved by the Secretariat of the Millennium Development Goals Achievement Fund (MDG-F) on 2 April 2008, but a few months later one of the partners, the United Nations Human Rights Office (UNHRO), had to close operations in the country. This substantially delayed the start of the programme, which was adapted to be implemented by the remaining agencies and their governmental partners: (1) United Nations Children s Fund (UNICEF), United Nations Development Programme (UNDP) as lead agency, International Labour Organization (ILO), International Organization for Migration (IOM); (2) Ministério do Ambiente da República de Angola (MINAMB), and the Ministério de Energia e Águas da República de Angola (MINEA) as lead government institution. The programme began in March 2009 with the effective delivery of funds. The end date is, after the Secretariat endorsed on 20 March 2012 a twelve months no-cost extension, 20 March Neighbourhoods. 2 Estratégia de Desenvolvimento do Sector das Águas. 3 Programa de Desenvolvimento do Sector das Águas 4

7 4. The evaluation seeks to: (1) measure to what extent the joint programme has fully implemented its activities, delivered outputs and attained outcomes and specifically measuring development results; (2) generate substantive evidence based knowledge on best practices and lessons learned that could be useful to other development interventions at national and international level. 5. The evaluation process was conducted following a qualitative design, which is the option that best fits the type of questions described in the Terms of Reference (ToR) for the assignment, and best adapts to some particularities of joint programmes: multiplicity of agencies, national partners and society groups involved. The evaluator promoted a learning process essentially participatory and inclusive, giving voice to different population groups and institutions involved in the programme. 6. The main information collection tools used were: individual interview, Focus Groups Discussions (FGD) and participative workshops with the main evaluation stakeholders. 7. Evaluation users: (1) National and local partners: Administrações Municipais de Cacuaco and Viana and Distrito Urbano de Kilamba Kiaxi 4 (Província de Luanda), Administrações Municipais de Luena, Luau and Kamanongue (Província de Moxico), Departamento da Abastecimento de Água e Saneamento (DNAAS)/ Ministério de Energia e Águas (MINEA), Instituto de Ciências Religiosas de Angola, Unidade Técnica Nacional de Saneamento Ambiental (UTNSA)/Ministério do Ambiente (MINAMB), Universidade Agostinho Neto; (2) Agencia Española de Cooperación Internacional para el Desarrollo (AECID); (3) Secretariat of the Millennium Development Goals Fund (MDG-F); (4) United Nations Country Team (UNCT) agencies involved in the programme: UNICEF, UNDP, ILO and IOM; (5) the persons and communities involved in the activities promoted by the programme; (6) International Non-Governmental Organizations (INGOs): Oxfam GB, Dom Bosco, Lutheran World Federation and Salvation Army; (7) Angolan Non-Governmental Organizations (NGOs): Development Workshop; (8) private sector: Kazukama and Mambeto. 8. Some context issues that turned to adversely affect the development of the originally planned strategy were clearly identified in the design phase but no alternative solutions were assessed in that case of identified risks such as cost effectiveness, pace of reform, realignment of capacities and availability of national expertise. An in-depth feasibility assessment would have probably recommended the development 4 The Administração Municipal of Kilamba Kiaxi was taken up by the Administração Municipal of Luanda just before the national elections held on 31 August

8 of a more realistic intervention proposal. Finally, the intervention strategy was not gender sensitive; characteristic that would have required a gender needs assessment during the design phase. 9. The programme has been able to make some significant contributions to the development of the water and sanitation public policy framework that are in the process of institutionalization, namely: (1) three studies that will facilitate the effective implementation of the Lei de Águas (MINEA); (2) Plano Nacional de Saneamento Ambiental (MINAMB); (3) Plano Estratégico Nacional de Gestão de Resíduos Sólidos (PESGRU) (MINAMB), which was partially sponsored the programme. Additionally, the Modelo de Gestão Comunitária de Água (MOGECA), developed by the Angolan Non Governmental Organization (NGO) Development Workshop (DW) in partnership with UNICEF and the European Union, and widely applied by UNICEF during the JP WatSan implementation, has been officially endorsed by the MINEA. 10. Approximately 258,000 persons (100,844 women) were benefited with new or rehabilitated water systems (new water points: 50; water points rehabilitated; 72 water supply at schools were installed or rehabilitated; 41 Water supply at health centres were installed or rehabilitated; 8 small water systems were installed or rehabilitated). 11. Approximately 68,216 persons were trained in Community Led Total Sanitation (CLTS), which is an approach to sanitation considered as strategic by the EA and included in its Estratégia de Combate a Pobreza (Poverty Reduction Strategy). 12. Águas de Portugal, the consulting company that facilitated the participative elaboration of the Plano Diretor de Água e Saneamento of Kilamba Kiaxi Municipality compiled and submitted all the materials used to the Instituto de Formação de Administração Local (IFAL), which is the institution responsible for municipal capacity development in Angola. IFAL has already trained some other municipalities in the preparation of participative Planos Diretores Gerais Municipais, although needs some capacity building to replicate training specializing in the elaboration of Planos Diretores Municipais de Água e Saneamento. 13. The programme was designed jointly among the participating UNCT agencies with low involvement of national and sub-national partners. Implementation and monitoring have not been conducted in a joint way: agencies continued to do their business as usual in terms of the nature and modality of implementing the activities within context of the joint programme. Additionally, the value added of some UNCT agencies involved in the programme is questionable. 6

9 14. Ownership of the MDG-F joint programming model among UNCT agencies can be assessed as reduced: UNCT agencies managers interviewed during the final evaluation process consider the joint programming model proposed by the MDG-F as an artificial external imposition that, according to some opinions of technical staff members of the UNCT agencies involved, obstructed implementation. Recently, the UNCT created a permanent interagency coordination body involving UNCT agencies deputy managers (Programme Management Group) that is considered more interesting by the UNCT agencies than an ad hoc structure. 15. The programme has operated with reduced effectiveness: only 37% of the planned targets were finally totally achieved. The evaluation detected some situations that indicate problems of sustainability of two components: (1) small businesses sponsored by IOM that benefitted the GAS in Moxico Province. (2) Water systems installed/rehabilitated by UNICEF; although there are some exceptions, like the chafarizes 5 rehabilitated in bairro Pedreira (Cacuaco Municipality, Province of Luanda), where the excellent community organizational level (Comissão do Moradores) appears key to overcoming the multiple sustainability problems faced by these systems in Angola, chiefly: limited financial and human resources among provincial and municipal administrations, which are not really able to provide adequate maintenance to water systems and keep a stock of spare parts; extreme vulnerability of rural communities in Moxico Province; very weak organizational levels in rural areas in Moxico Province and also weak organizational structures in some bairros in peri-urban Luanda. 16. It has to be added that UNICEF highlights, as a lesson learned on water points in rural areas, that systems are sustainable only when there is and active and continuous support from the users that includes financial contribution for maintenance. However, organizing and motivating communities for this role is not an easy task. Therefore it is also a challenge and responsibility of the EA and Direções Provinciais de Energia e Água to facilitate this aspect through education of the rural population. UNICEF continues to work in this direction supporting provincial partners, but behavioural change takes time to show results beyond the time scope of the programme. 5 Water points. 7

10 17. Products and outputs potentially sustainable: Planos Diretores Municipal de Água e Saneamento 6 of Kilamba Kiaxi, Luau and Kamanongue. The studies that complement the Lei de Águas (MINEA). Plano Estratégico Nacional de Gestão de Resíduos Sólidos (MINAMB): already approved by the National Assembly. The DNAAS is preparing the corresponding implementation decrees to receive a budget for its implementation and considers that this Plano Estratégico will contribute to a complete restructuration of the sector. Plano Nacional de Saneamento Ambiental: the draft version has yet to be approved by the National Assembly. The DNAAS assesses this product as a strategic one for the EA. Modelo de Gestão Comunitária (MOGECA): officially endorsed by the MINEA. CLTS approach and Sanitation Marketing: already approved by the EA. CLTS training manual for community agents: already approved by the EA. Water Quality manual: approved by DNAAS. Contract Management training documentation: approved by DNAAS and part of the training of the DNAAS personnel. Communication material on Hygiene, Water Treatment, and Safe Storage (HWTSS), Hands Washing and CLTS: approved by the EA. It seems that SEFOJOR will continue funding trainings on MDGs. Water systems installed in bairro Pedreira in Cacuaco Municipality. 1. INTRODUCTION 1.1. Background 18. The Millennium Development Goals Achievement Fund (MDG-F) is an International Cooperation mechanism whose aim is to accelerate progress on the Millennium Development Goals (MDGs) worldwide. Established in December 2006 with a contribution of 528 million from the Spanish Government to the United Nations system, the MDG-F supports national governments, local authorities and citizen organizations in their efforts to tackle poverty and inequality. In September 2008 at the UN High Level Event on MDGs, Spain committed an additional 90 million to the MDG-F. 6 Every municipality must have a Plano Diretor Municipal de Água e Saneamento by the end of 2013 according to the Lei de Águas. The EA will provide funds to implement these plans during

11 19. The MDG-F operates through the UN teams in each country, promoting increased coherence and effectiveness in development interventions in line with the Paris Declaration and the Accra Agenda for Action through collaboration among UN agencies. The Fund uses a joint Programme mode of intervention and has currently approved 130 joint Programmes in 50 countries. These reflect eight thematic windows that contribute in various ways towards progress on the MDGs. 20. This evaluation is part of a monitoring and evaluation strategy based on results designed by MDG-F Secretariat. The strategy is based on the principles of the Evaluation Group of the United Nations (UNEG) and the Organisation for Economic Co-operation and Development (OECD) on the quality and independence of the evaluations. Additionally, this evaluation will seek to continue the mid-term evaluation process and its recommendations. 21. The unit of analysis or object of study for this evaluation is the joint programme Governance of Water and Sanitation in Angola s poor Neighbourhoods (JP WatSan), understood to be the set of components, outcomes, outputs, activities and inputs that were detailed in the joint programme document and in associated modifications made during implementation. 22. This evaluation report has been prepared by the evaluator according to the requirements described in the Terms of Reference (ToR) of the final evaluation of the joint programme, according to the Norms and Standards of the UNEG, and following the format recommended by the Secretariat of the MDG-F Goals and methodology of evaluation Specific objectives of the evaluation: (1) to measure to what extent the JP has contributed to solve the needs and problems identified in the design phase; (2) to measure the programme s degree of implementation, efficiency and quality delivered on outputs and outcomes, against what was originally planned or subsequently officially revised; (3) to measure to what extent the JP has attained development results to the targeted population, beneficiaries, participants and the most marginalized whether individuals, communities, institutions, etc.; (4) to measure the joint programme contribution to the objectives set in its respective specific thematic window as well as the overall MDG fund objectives at local and national levels (MDGs, Paris Declaration and Accra Principles and UN reform); (5) to identify and document substantive 9

12 lessons learned and good practices on the specific topics of the thematic window, MDGs, Paris Declaration, Accra Principles and UN reform with the aim to support the sustainability of the joint programme or some of its components Methodology 24. The evaluation was carried out following a qualitative design. Qualitative research consists in placing people and their experiences at the centre of the process. This methodology allows getting an objective snapshot of the programme situation through the comparison of different experiences and points of view about the same events. Quantitative data included in the results framework were also be analysed. 25. Main characteristics of the evaluation methodology: (1) the evaluation was conducted under a gender perspective; (2) Human Rights approach with special attention to international conventions and regulatory frameworks; (3) participative approach. 26. Gender approach: it has been introduced through the review of the evaluation questions using the Harvard Analytical Framework, which has three main components: activity profile, access and control profile and analysis of influencing factors. The Harvard Analytical Framework was applied indirectly, through the inclusion of its components in the specific evaluation questions in the Evaluation Matrix (Annex 1). 27. Human Rights-based Approach: (1) the evaluation plan emphasized the participation of primary stakeholders (people and communities involved in the activities promoted by the programme) in the evaluation process. (2) The evaluation matrix includes two questions to study: (i) how Human Rights treaties and instruments informed the design process, and (ii) to what extent the design identified the relevant Human Rights claims and obligations. (3) The evaluation matrix also includes several questions aimed to analyse how the programme has influenced public policies, norms, standards and regulations related to access to water and sanitation. 28. Participation: the following participative work sessions with the Programme Management Committee (PMC) took place: (1) workshop dedicated to the contextualization of main findings after the first half of the evaluation mission; (2) final workshop dedicated to the contextualization of final conclusions and 10

13 recommendations. Objectives of these workshops: (1) to produce contextualized and realistic conclusions and recommendations; and (2) to promote ownership of the evaluation process Information collection tools: the main information collection tool was the individual interview. Individual interviews were defined to include all the evaluation questions proposed (Annex 2) in the ToR. The types of interviews applied, depending on the situation and the interviewee, were, in increasing order of structuring: (1) casual conversation, (2) guided interview and (3) standardized open-ended interview. Other information collection tools: desk review, Focus Group Discussions (FGD) with different groups of beneficiaries, participative work sessions with the PMC, and direct observation. The different tools were applied flexibly in order to achieve their adaptation to the working conditions Elaboration of the guides for the interviews and FDGs 30. The tool to put into practice the key questions described by the ToR, the particularities of a qualitative methodological approach and the mentioned evaluation main characteristics is the evaluation matrix (Annex 1). 31. As the evaluation matrix is a basic element in any evaluation, it s interesting to share some details of its construction: (1) the second column lists all the evaluation key questions described in the ToR classified by criterion. (2) Given that some of the key questions are too complex to be answered directly and some of them need to be completed to incorporate the gender and Human Rights approaches, a list of specific evaluation questions were prepared by the evaluator. (3) Next step was identifying the best information sources for each specific evaluation question. By doing so two objectives can be accomplished: (i) the evaluation gets open to broad participation through the inclusion of the widest possible range of participants in the evaluation process; and (ii) the answers to each question can be triangulated to obtain views as objective as possible about each issue. The last column assigns a code to every specific evaluation question to properly classify the information from each source of information, which allows processing data in a systematic way Information sources: primary stakeholders (people and communities involved in the activities promoted by the programme), UNCT agencies personnel involved in the design and/or implementation of the programme, staff of the national and local partners involved in the design and/or implementation of the programme, and AECID staff involved in the design and/or implementation of the programme. 11

14 Systematization of the information 33. Information from different sources was processed by the evaluator with the aim to compare, consolidate and analyse different opinions and data corresponding to every evaluation question in order to extract main findings and propose conclusions and recommendations, which were discussed with the PMC in the two already mentioned workshops. Findings, conclusions and recommendations are (1) based on data gathered, (2) gender sensitive, (3) formulated in the most objective way possible and avoiding personal opinions of the evaluator. The recommendations have a direct link to one or more conclusions, are realistic and easy to implement in future interventions with a reasonable investment of efforts Evaluator: Carlos Carravilla, founding member and member of the board of the Col lectiu d'estudis sobre Cooperació i Desenvolupament (El Col lectiu) 7, independent consultant specializing in tools and methodologies of International Cooperation Evaluation constraints: (1) the evaluator couldn t visit Luao (Moxico Province) because of poor coordination between IOM and UNICEF; (2) a higher involvement of UNICEF in the final evaluation process would have been beneficial (visits to programme locations in Viana and Luanda Province); (3) it was not possible to talk to the ILO s focal point for the programme via teleconference, although the UN agencies questionnaire (Annex 2) was sent to the ILO and completed; (4) it was not possible to get substantial information to report on the level of implementation of planned activities Description of the joint programme and the work context Context 36. Angola has made substantial progress in economic and political terms since the end of the war. However, the country continues to face massive developmental challenges which include reducing the dependency on oil and diversifying the economy, rebuilding its infrastructure, improving institutional capacity, governance, public financial management systems, human development indicators and the living conditions of the population

15 37. There have been moves to crack down on corruption and improve governance in the country since the president called for greater transparency in the management of public funds, and indicated a zero tolerance approach. As a result, the Law on Administrative Probity was approved on March 5, 2010 by the National Assembly, but implementation mechanisms and monitoring remain unclear Angola s Human Development Index (HDI) value for 2011 is 0.486, in the low human development category, positioning the country at 148 out of 187 countries and territories. Between 2000 and 2011, Angola s HDI value increased from to 0.486, an increase of 27.0 per cent or average annual increase of about 2.2 per cent 10. Finally, Angola is a middle-income country. 39. Due to a lack of relevant data, the Gender Inequality Index (GII) has not been calculated for this country. 40. Angola has the highest rate of diarrheal disease in the world with 114 years of life lost to diarrheal diseases for every 1,000 Angolans. Contaminated water, inadequate storm water drainage, and lack of even minimal sanitation facilities have resulted in high, and steadily increasing, rates of water and excretarelated diseases. Some of the worst sanitation in Angola can be found in its capital, Luanda, as well as in the hillside refugee camps surrounding the city where more than a million internally displaced persons still reside While the streamlining of institutional reforms has fostered momentum in water supply and sanitation sector development, constraints on further reforms and sustainability are due to the lack of financial, managerial, and technical capacity in the sector The Angolan government s objective is to increase the proportion of people having access to safedrinking water and adequate sanitation from 33% to 81% and from 48% to 74% respectively in the period Human Development Report USAID. Angola, Water and Sanitation Profile. 12 USAID. Angola, Water and Sanitation Profile. 13 JP WatSan programme document. 13

16 43. Governance figures among the main constraints to the expansion of water and sanitation services to reach more people, especially the poorest. The main issue is the un-sustainability of water standpoints that are managed by state-owned utility 14. Other identified constraints include: weakness of the regulatory and normative framework, lack of communities participation in decision-making processes related to water and sanitation, low investment in the capacity of WatSan institutions, and the absence of an accountability framework The joint programme (JP) 44. The JP WatSan in Angola (March 2009-March 2013), with a total approved budget of USD 7,600,000, aims to support national priorities on the water and sanitation sector bringing together different key actors, such as the MINEA, the MINAMB, local administrations, Civil Society Organizations, etc.; and building on comparative strengths and expertise from UNDP (USD 2,450,000), UNICEF (USD 3,750,000), IOM (USD 1,150,000), and ILO (USD 250,000). 45. The main implementing partners are the MINEA and MINAMB. These ministries are responsible for ensuring access to water and sanitation respectively to populations and therefore the main entities responsible for the realization of the objective of this programme. However due to the strong orientation of the programme towards water supply, MINEA is the key counterpart and direct beneficiary of most of the programme outputs/activities including water sector policy and regulation related issues, while MINAMB provides leadership to the (Community Led total Sanitation) component and benefits from the sanitation sector policy and regulation support 46. To achieve this, the programme seeks to: (1) establish a pro-poor policy and regulatory framework that feature community participation in the provision and management of WatSan facilities; (2) promote the autonomy of communities in the management of WatSan facilities 16 ; (3) reinforce the capacity of local governments to effectively monitor community WatSan management units, mobilize resources and fund community WatSan projects; (4) put in place an enhanced accountability system for peri-urban and rural water and sanitation sector. 14 JP WatSan programme document. 15 JP WatSan programme document. 16 The programme proposes a model of governance based on a network of autonomous units of small and medium scale WatSan utilities owned and managed by communities, namely the Grupos de Águas e Saneamento (GAS). 14

17 Table 1. Reshaped Results Framework according to the results of the baseline study (June 2010) Outcome: Community-oriented governance of peri-urban and rural water and sanitation sector promoted through autonomy-driven institutional, regulatory and accountability system (Governação e gestão orientada para a comunidade, do sector peri-urbano e rural de água e saneamento, promovido através de um sistema institucional, regulatório e de responsabilização orientado à autonomia). Joint Programme Outputs SMART Outputs Output 1. Legal and regulatory framework in favour of vulnerable and community management in place and functioning. Resultado 1: Quadro legal e regulatório com orientação a favor dos vulneráveis e da gestão comunitária, estabelecido e a funcionar. Output 2. Autonomy-oriented community water structures ensuring sustainable access to WatSan in all targeted areas. Resultado 2: Estruturas comunitárias autónomas de água assegurando o acesso sustentável a água e saneamento em todas as áreas alvo. Output 3. Mechanisms for monitoring and financing of community water systems and sanitation established at municipal level. Resultado 3: Mecanismos para a monitoria e financiamento dos sistemas comunitários de água e saneamento estabelecidos a nível municipal. Output 4. Established mechanisms for accountability of municipalities in service delivery of water supply and sanitation in peri-urban and rural. Resultado 4: Mecanismos estabelecidos para a responsabilização dos municípios na prestação dos serviços de abastecimento de água e saneamento nas áreas peri-urbanas e rurais. Output 5. Management and administration of the programme. Resultado 5: Gestão e administração do programa Output 1.1. Water and sanitation policies in place. Resultado 1.1. Políticas de água e saneamento operacionais. Output municipal master plans for water and sanitation, including models of community management, developed and adopted. Resultado planos diretores municipais de água e saneamento, incluindo modelos de gestão comunitária, elaborados e adoptados. Output 1.3. Water and sanitation regulatory framework in favour of the most vulnerable consolidated. Resultado 1.3. Quadro regulatório a favor dos vulneráveis consolidado para água e saneamento. Output 1.4. SISAS disseminates information and guides policy reforms and regulations. Resultado 1.4. SISAS a propagar informação e a guiar as reformas de políticas e regulamentos. Output 2.1. Users gain access to sustainable water and sanitation in target areas. Resultado 2.1: Usuários obtêm acesso sustentável a água e saneamento nas áreas alvo. Output 2.2. Community structures trained in the management of water and sanitation. Resultado 2.2.Estruturas comunitárias de água capacitadas na gestão de água e saneamento. Output 2.4. Local contractors trained for the supply of equipment and services to the community water system. Resultado 2.3. Empreiteiros locais capacitados para o fornecimento de equipamento e serviços aos sistemas comunitários de água. Output 2.4. Sustainable livelihoods Projects implemented in target areas. Resultado 2.4. Projetos de meios de vida sustentáveis implementados nas áreas alvo. Output 3.1. Information systems in place to monitor and supervise community structures. Resultado 3.1: Sistemas de informação estabelecidos para monitorar e supervisar as estruturas comunitárias. Output 3.2. Funds for Municipal Development of Water and Sanitation established. Resultado 3.2: Fundos Municipais de Fomento de Água e Saneamento estabelecidos. Municipal responsibility index. Índice de Responsabilização Municipal Output 4.1. Residents of the areas targeted have knowledge of their rights and information on water and sanitation and its management. Resultado 4.1. Residentes das áreas alvo têm conhecimentos dos seus direitos e informação sobre água e saneamento e a sua gestão. Output 4.2. Consumers alliances trained and capacitated to demand the improvement of services. Resultado 4.2. Alianças de consumidores formadas e capacitadas para reivindicarem o melhoramento de serviços. Output 4.3. National Forum on Water Institutionalized. Resultado 4.3. Fórum Nacional de Água institucionalizado. Output 4.4. Periodic participatory evaluation of the provision of WatSan services realized in the target localities. Resultado 4.4: Avaliação regular e participativa do abastecimento de água e saneamento. Planning and implementation. Planificação e implementação. Output 5.1. Coordination. Resultado 5.1: Coordenação. Output 5.2 Monitoring and evaluation. Resultado 5.2. Monitoria e avaliação. 15

18 47. Areas of intervention: Luanda and Moxico provinces in Angola: municipalities of Cacuaco, Viana and Kilamba Kiaxi (Province of Luanda) and the municipalities of Luena, Kamanongue and Luau (Province of Moxico). Figure 1. Location of the programme Source: 16

19 2. FINDINGS BY LEVEL OF ANALYSIS AND INFORMATION NEEDS 2.1. DESIGN LEVEL Relevance Programme design 48. The programme document was designed according to the Lei de Águas (2002) 17 ; nevertheless, no specific in-depth assessments, including gender needs assessments, were conducted before or during the design. Additionally, it seems that the programme was not designed with full and systematic participation of the national and sub-national partners and beneficiaries, although some consultations were done: (1) in 2008 UNICEF and IOM visited the Administração Municipal of Luena to introduce the programme; (2) a consultant (UNICEF) travelled to Luena to assess water and sanitation needs at the community level, though it was the Administração Municipal of Luena that decided which communities would be benefited by the programme. 49. When the programme was presented to the MINEA, the attitude of the ministry was no so collaborative since the Executivo Angolano (EA) was already implementing at that time the programme Água para Todos, a large water and sanitation infrastructure intervention at national level with a budget over USD 650,000,000. Although the EA could have benefited more from some complementarities, the limited budget of the JP WatSan compared to the budget of Água para Todos and to the needs of a country in transition and reconstruction after a long civil war very probably contributed to limited interest in the programme among ministerial decision makers. 50. The United Nations Human Rights Office (UNHRO) participated in the preparation of the concept note but closed operations in the country before the programme started. 17 It defines the policy framework for water resources management in general, and sets the foundation for the national policy for the use of water as consumption good. 17

20 Table 2. Budget (USD) modification after UNRCO closed operations in Angola Concept note Approved Modification budget budget PNUD 3, ,450,000-18% UNICEF 4,749,600 3,750,000-21% UNHRO 1,300, % OIM 1,388,406 1,150,000-17% ILO 1,551, ,000-84% Total 11,994,804 7,600,000-37% Source: Mid-term evaluation report. 51. It is necessary to comment on the role of ILO in the programme given the drastic reduction in its budget between the concept note (1,551,798 USD) and the programme finally approved (250,000 USD). ILO was actively involved in the design phase and, according to the memorandum of understanding between all participating UN agencies (October 2007), it was supposed to deliver, through a permanent ILO project team based in Luanda, and in collaboration with IOM, outputs related to (1) capacity building on income generating activities for targeted communities and (2) capacity building for local entrepreneurs operating in water and sanitation sectors. In March 2009, the final programme document (PRODOC) was sent to the ILO for signature with a budget of 250,000 USD to implement Output 2.3 (Resultado 2.3: Empreiteiros locais capacitados para o fornecimento de equipamento e serviços aos sistemas comunitários de água). ILO signed the PRODOC despite considering that the amount allocated was probably insufficient to meet the planned targets (OVIs 2.3.1, and were finally not achieved). Probably, the non-resident status of ILO limited its capacity to adequately negotiate its role in the joint programme. Programme redesign 52. In regards to the recommendations submitted by the Secretariat to the UNRC in Angola on 2 April 2008 together with the communication of official approval of the programme: The Ministério do Planeamento officially endorsed the JP WatSan when the Ministra do Planeamento signed the official programme document. 18

A. Situação / Situation

A. Situação / Situation A. Situação / Situation A Assembleia Mundial da Saúde (OMS) aprova em 1969 o Regulamento Sanitário Internacional, revisto pela quarta vez em 2005. Esta última versão entrou em vigor no plano internacional

Leia mais

Banca examinadora: Professor Paulo N. Figueiredo, Professora Fátima Bayma de Oliveira e Professor Joaquim Rubens Fontes Filho

Banca examinadora: Professor Paulo N. Figueiredo, Professora Fátima Bayma de Oliveira e Professor Joaquim Rubens Fontes Filho Título: Direção e Taxa (Velocidade) de Acumulação de Capacidades Tecnológicas: Evidências de uma Pequena Amostra de Empresas de Software no Rio de Janeiro, 2004 Autor(a): Eduardo Coelho da Paz Miranda

Leia mais

Federal Court of Accounts Brazil (TCU) Auditing Climate Change Policies

Federal Court of Accounts Brazil (TCU) Auditing Climate Change Policies Federal Court of Accounts Brazil (TCU) Auditing Climate Change Policies JUNNIUS MARQUES ARIFA Head of Department of Agriculture and Environmental Audit TCU s mandate and jurisdiction 1. Role of Supreme

Leia mais

The Brazil United States Consumer Product Safety Conference Brazil United States Joint Press Statement June 10, 2011 Rio de Janeiro, Brazil Common Interests Ensuring a high level of consumer product safety

Leia mais

Local & Regional Development. Expanding the positive impacts of mining projects

Local & Regional Development. Expanding the positive impacts of mining projects Local & Regional Development Expanding the positive impacts of mining projects Defining local and regional development Factors: Economic Social Specific to communities Need for ongoing consultations Link

Leia mais

Participatory Map of Rio de Janeiro

Participatory Map of Rio de Janeiro Leandro Gomes Souza Geographer Luiz Roberto Arueira da Silva Director of City Information Pereira Passos Institute - City of Rio de Janeiro About us Pereira Passos Institute (IPP) is Rio de Janeiro municipal

Leia mais

Project Management Activities

Project Management Activities Id Name Duração Início Término Predecessoras 1 Project Management Activities 36 dias Sex 05/10/12 Sex 23/11/12 2 Plan the Project 36 dias Sex 05/10/12 Sex 23/11/12 3 Define the work 15 dias Sex 05/10/12

Leia mais

Institutional Skills. Sessão informativa INSTITUTIONAL SKILLS. Passo a passo. www.britishcouncil.org.br

Institutional Skills. Sessão informativa INSTITUTIONAL SKILLS. Passo a passo. www.britishcouncil.org.br Institutional Skills Sessão informativa INSTITUTIONAL SKILLS Passo a passo 2 2 British Council e Newton Fund O British Council é a organização internacional do Reino Unido para relações culturais e oportunidades

Leia mais

Multicriteria Impact Assessment of the certified reference material for ethanol in water

Multicriteria Impact Assessment of the certified reference material for ethanol in water Multicriteria Impact Assessment of the certified reference material for ethanol in water André Rauen Leonardo Ribeiro Rodnei Fagundes Dias Taiana Fortunato Araujo Taynah Lopes de Souza Inmetro / Brasil

Leia mais

Salud Brasil SECRETARIA DE VIGILÂNCIA EM SAÚDE

Salud Brasil SECRETARIA DE VIGILÂNCIA EM SAÚDE Salud Brasil SECRETARIA DE VIGILÂNCIA EM SAÚDE IV EXPOEPI International Perspectives on Air Quality: Risk Management Principles for Oficina de Trabalho: Os Desafios e Perspectivas da Vigilância Ambiental

Leia mais

assumptions of that particular strengthening the participation of families and local communities in the strategic direction of schools, not taking

assumptions of that particular strengthening the participation of families and local communities in the strategic direction of schools, not taking Agradecimentos A dissertação do Mestrado que adiante se apresenta resulta na concretização de um projecto que me parecia difícil mas não impossível de alcançar. Foram meses seguidos de trabalho de investigação,

Leia mais

UNIVERSIDADE CATÓLICA PORTUGUESA. A Reputação e a Responsabilidade Social na BP Portugal: A importância da Comunicação. Por. Ana Margarida Nisa Vintém

UNIVERSIDADE CATÓLICA PORTUGUESA. A Reputação e a Responsabilidade Social na BP Portugal: A importância da Comunicação. Por. Ana Margarida Nisa Vintém UNIVERSIDADE CATÓLICA PORTUGUESA A Reputação e a Responsabilidade Social na BP Portugal: A importância da Comunicação Relatório de estágio apresentado à Universidade Católica Portuguesa para obtenção do

Leia mais

The Indigenous Population of Brazil 1991 Population Census

The Indigenous Population of Brazil 1991 Population Census The Indigenous Population of Brazil 1991 Population Census Authors: Nilza Oliveira Martins Pereira (principal author), Tereza Cristina Nascimento Araujo, Valéria Beiriz, Antonio Florido- IBGE The definition

Leia mais

Integração de Imigrantes

Integração de Imigrantes Integração de Imigrantes ODEMIRA INTEGRA It is a project born from the need to improve and increase support measures, reception and integration of immigrants. 47% of immigrants registered in the district

Leia mais

Digital Cartographic Generalization for Database of Cadastral Maps

Digital Cartographic Generalization for Database of Cadastral Maps Mariane Alves Dal Santo marianedalsanto@udesc.br Francisco Henrique de Oliveira chicoliver@yahoo.com.br Carlos Loch cloch@ecv.ufsc.br Laboratório de Geoprocessamento GeoLab Universidade do Estado de Santa

Leia mais

Mainstreaming Sustainable Tourism

Mainstreaming Sustainable Tourism 8. Se sim, quais os meios mais apropriados para tanto? Não aplicável Em estudo Em implementação Implementado Divulgação de informações sobre as práticas de sustentabilidade realizadas ou apoiadas pelo

Leia mais

ELEnA European Local ENergy Assistance

ELEnA European Local ENergy Assistance ECO.AP Programa de Eficiência Energética na Administração Pública ELEnA European Local ENergy Assistance Lisboa, 6/03/2015 Desafios 1 Conhecimento: a) Edifícios/equipamentos; b) Capacidade técnica; c)

Leia mais

CARTA DE RECOMENDAÇÃO E PRINCÍPIOS DO FORUM EMPRESARIAL RIO+20 PARA A UNCSD-2012

CARTA DE RECOMENDAÇÃO E PRINCÍPIOS DO FORUM EMPRESARIAL RIO+20 PARA A UNCSD-2012 CARTA DE RECOMENDAÇÃO E PRINCÍPIOS DO FORUM EMPRESARIAL RIO+20 PARA A UNCSD-2012 (CHARTER OF RECOMMENDATION AND PRINCIPLES OF FORUM EMPRESARIAL RIO+20 TO UNCSD-2012) Nós, membros participantes do FÓRUM

Leia mais

Melhorando o ambiente de negócios por meio da transparência no Estado de São Paulo Dentro do MoU (Memorando de Entendimento) que o Governo do Estado tem com o Reino Unido estão sendo promovidos vários

Leia mais

Governancia da Água. Contributo de Portugal e da PPA para o Plano Estratégico de Implementação da Parceria Europeia para a Inovação no Domínio da Água

Governancia da Água. Contributo de Portugal e da PPA para o Plano Estratégico de Implementação da Parceria Europeia para a Inovação no Domínio da Água A Água e o Programa Horizonte 2020 (8ºPQ) Contributo de Portugal e da PPA para o Plano Estratégico de Implementação da Parceria Europeia para a Inovação no Domínio da Água Governancia da Água Francisco

Leia mais

Analysis, development and monitoring of business processes in Corporate environment

Analysis, development and monitoring of business processes in Corporate environment Analysis, development and monitoring of business processes in Corporate environment SAFIRA is an IT consulting boutique known for transforming the way organizations do business, or fulfil their missions,

Leia mais

design para a inovação social

design para a inovação social design para a inovação social mestrado em design - 15 16 universidade de aveiro gonçalo gomes março de 2016 s.1 ergonomia ergonomia > definição Ergonomia A ergonomia (do grego "ergon": trabalho; e "nomos":

Leia mais

Otimização geral de processos (OEE) Fabian Prehn Campinas Setembro 2014

Otimização geral de processos (OEE) Fabian Prehn Campinas Setembro 2014 Otimização geral de processos (OEE) Fabian Prehn Campinas Setembro 2014 Agenda Agenda Futuro da produção farmacêutica Future of pharmaceutical production Compressão como principal ponto no processo de

Leia mais

THE BRAZILIAN PUBLIC MINISTRY AND THE DEFENSE OF THE AMAZONIAN ENVIRONMENT

THE BRAZILIAN PUBLIC MINISTRY AND THE DEFENSE OF THE AMAZONIAN ENVIRONMENT THE BRAZILIAN PUBLIC MINISTRY AND THE DEFENSE OF THE AMAZONIAN ENVIRONMENT Raimundo Moraes III Congresso da IUCN Bangkok, November 17-25 2004 ENVIRONMENTAL PROTECTION IN BRAZIL The Constitution states

Leia mais

EIA and SEA differences and relationship

EIA and SEA differences and relationship Mestrado em Urbanismo e Ordenamento do Território/ Master in Urban Studies and Territorial Management Mestrado em Engenharia do Ambiente / Master in Environmental Engineering Avaliação Ambiental Estratégica

Leia mais

Challenges and lessons learned from the Surui Forest Carbon Project, Brazilian Amazon. Pedro Soares / IDESAM

Challenges and lessons learned from the Surui Forest Carbon Project, Brazilian Amazon. Pedro Soares / IDESAM Challenges and lessons learned from the Surui Forest Carbon Project, Brazilian Amazon Pedro Soares / IDESAM Project Proponent & Partners Proponent: Support and supervise the project activities and will

Leia mais

Sustainability issues in the Brazilian automotive industry: electric cars and end-of-life vehicles

Sustainability issues in the Brazilian automotive industry: electric cars and end-of-life vehicles Sustainability issues in the Brazilian automotive industry: electric cars and end-of-life vehicles Adcley Souza (adcley.souza@hotmail.com) Sustainability issues in the Brazilian automotive industry: electric

Leia mais

GUIÃO Domínio de Referência: CIDADANIA E MULTICULTURALISMO

GUIÃO Domínio de Referência: CIDADANIA E MULTICULTURALISMO PROJECTO PROVAS EXPERIMENTAIS DE EXPRESSÃO ORAL DE LÍNGUA ESTRANGEIRA - 2005-2006 Ensino Secundário - Inglês, 12º ano - Nível de Continuação 1 1º Momento GUIÃO Domínio de Referência: CIDADANIA E MULTICULTURALISMO

Leia mais

BR-EMS MORTALITY AND SUVIVORSHIP LIFE TABLES BRAZILIAN LIFE INSURANCE AND PENSIONS MARKET

BR-EMS MORTALITY AND SUVIVORSHIP LIFE TABLES BRAZILIAN LIFE INSURANCE AND PENSIONS MARKET BR-EMS MORTALITY AND SUVIVORSHIP LIFE TABLES BRAZILIAN LIFE INSURANCE AND PENSIONS MARKET 2015 1 e-mail:mario@labma.ufrj.br Tables BR-EMS, mortality experience of the Brazilian Insurance Market, were constructed,

Leia mais

REPÚBLICA DE MOÇAMBIQUE MINISTÉRIO DA AGRICULTURA PROGRAMA DE APOIO AO DESENVOLVIMENTO RURAL NAS PROVINCIAS DE MANICA E SOFALA - PADR

REPÚBLICA DE MOÇAMBIQUE MINISTÉRIO DA AGRICULTURA PROGRAMA DE APOIO AO DESENVOLVIMENTO RURAL NAS PROVINCIAS DE MANICA E SOFALA - PADR REPÚBLICA DE MOÇAMBIQUE MINISTÉRIO DA AGRICULTURA PROGRAMA DE APOIO AO DESENVOLVIMENTO RURAL NAS PROVINCIAS DE MANICA E SOFALA - PADR Concurso com Previa Qualificação Convite para a Manifestação de Interesse

Leia mais

Português 207 Portuguese for Business

Português 207 Portuguese for Business Português 207 Portuguese for Business Spring 2012: Porugal and the EU Instructor: Jared Hendrickson Office: 1149 Van Hise Office Hours: Monday and Thursday, 11:00 am-12:00 pm e-mail: jwhendrickso@wisc.edu

Leia mais

Interoperability through Web Services: Evaluating OGC Standards in Client Development for Spatial Data Infrastructures

Interoperability through Web Services: Evaluating OGC Standards in Client Development for Spatial Data Infrastructures GeoInfo - 2006 Interoperability through Web Services: Evaluating OGC Standards in Client Development for Spatial Data Infrastructures Leonardo Lacerda Alves Clodoveu A. Davis Jr. Information Systems Lab

Leia mais

ANO I Abertura Opening Os primeiros movimentos do jogo Há um ano, três advogados vindos de renomados escritórios de advocacia, onde exerciam funções de destaque, se reuniram em torno de uma idéia:

Leia mais

Information technology specialist (systems integration) Especialista em tecnologia da informação (integração de sistemas)

Information technology specialist (systems integration) Especialista em tecnologia da informação (integração de sistemas) Information technology specialist (systems integration) Especialista em tecnologia da informação (integração de sistemas) Professional activities/tasks Design and produce complex ICT systems by integrating

Leia mais

ST. PAUL S SCHOOL. To be considered Charity of the Year applicants should meet the following requirements:

ST. PAUL S SCHOOL. To be considered Charity of the Year applicants should meet the following requirements: ST. PAUL S SCHOOL CHARITY OF THE YEAR APPLICATION FORM How to apply for funding 1. Application - Requirements and Conditions To be considered Charity of the Year applicants should meet the following requirements:

Leia mais

ESTRUTURA DE CAPITAL: UMA ANÁLISE EM EMPRESAS SEGURADORAS

ESTRUTURA DE CAPITAL: UMA ANÁLISE EM EMPRESAS SEGURADORAS ESTRUTURA DE CAPITAL: UMA ANÁLISE EM EMPRESAS SEGURADORAS THE CAPITAL STRUCTURE: AN ANALYSE ON INSURANCE COMPANIES FREDERIKE MONIKA BUDINER METTE MARCO ANTÔNIO DOS SANTOS MARTINS PAULA FERNANDA BUTZEN

Leia mais

USPTO No. 15143095 USPTO No. 15143095 USPTO No. 15143095 USPTO No. 15143095 USPTO No. 15143095 USPTO No. 15143095 USPTO No. 15143095 WORK PLAN FOR IMPLEMENTATION OF THE UNITED STATES PATENT AND

Leia mais

DPI. Núcleo de Apoio ao Desenvolvimento de Projetos e Internacionalização Project Development And Internationalization Support Office

DPI. Núcleo de Apoio ao Desenvolvimento de Projetos e Internacionalização Project Development And Internationalization Support Office DPI Núcleo de Apoio ao Desenvolvimento de Projetos e Internacionalização Project Development And Internationalization Support Office Apresentação/Presentation Criado em 1 de março de 2011, o Núcleo de

Leia mais

Consórcio do Politecnico di Milano. Fevereiro 2013

Consórcio do Politecnico di Milano. Fevereiro 2013 Consórcio do Politecnico di Milano Fevereiro 2013 DESIGN DEFINITIONS SENAI & POLI.design Fevereiro 2013 Design como uma atividade específica no processo de P&D que visa a projetação dos aspectos funcionais

Leia mais

ACEF/1112/04062 Decisão de apresentação de pronúncia

ACEF/1112/04062 Decisão de apresentação de pronúncia ACEF/1112/04062 Decisão de apresentação de pronúncia ACEF/1112/04062 Decisão de apresentação de pronúncia Decisão de Apresentação de Pronúncia ao Relatório da Comissão de Avaliação Externa 1. Tendo recebido

Leia mais

Types of Investments: Equity (9 companies) Convertible Notes (10 companies)

Types of Investments: Equity (9 companies) Convertible Notes (10 companies) IMPACT INVESTING WE STARTED... A Venture Capital Fund Focused on Impact Investing Suport: Financial TA Criterias to select a company: Social Impact Profitabilty Scalability Investment Thesis (Ed, HC,

Leia mais

Semestre do plano de estudos 1

Semestre do plano de estudos 1 Nome UC Inglês CU Name Código UC 6 Curso LEC Semestre do plano de estudos 1 Área científica Gestão Duração Semestral Horas de trabalho 54 ECTS 2 Horas de contacto TP - 22,5 Observações n.a. Docente responsável

Leia mais

Neutron Reference Measurements to Petroleum Industry

Neutron Reference Measurements to Petroleum Industry LABORATÓRIO NACIONAL DE METROLOGIA DAS RADIAÇÕES IONIZANTES IRD- Instituto de Radioproteção e Dosimetria Neutron Reference Measurements to Petroleum Industry Karla C. de Souza Patrão, Evaldo S. da Fonseca,

Leia mais

NORMAS PARA AUTORES. As normas a seguir descritas não dispensam a leitura do Regulamento da Revista Portuguesa de Marketing, disponível em www.rpm.pt.

NORMAS PARA AUTORES. As normas a seguir descritas não dispensam a leitura do Regulamento da Revista Portuguesa de Marketing, disponível em www.rpm.pt. NORMAS PARA AUTORES As normas a seguir descritas não dispensam a leitura do Regulamento da Revista Portuguesa de Marketing, disponível em www.rpm.pt. COPYRIGHT Um artigo submetido à Revista Portuguesa

Leia mais

Erasmus Student Work Placement

Erasmus Student Work Placement Erasmus Student Work Placement EMPLOYER INFORMATION Name of organisation Address Post code Country SPORT LISBOA E BENFICA AV. GENERAL NORTON DE MATOS, 1500-313 LISBOA PORTUGAL Telephone 21 721 95 09 Fax

Leia mais

Unidade curricular: Sistemas de Informação para a Gestão Nº horas: 75 ECTS: 7 1.º ano

Unidade curricular: Sistemas de Informação para a Gestão Nº horas: 75 ECTS: 7 1.º ano Licenciatura em Gestão (1º ciclo) First Cycle Degree in Management Unidade curricular: Sistemas de Informação para a Gestão Nº horas: 75 ECTS: 7 1.º ano Curricular Unit: Information Systems for Management

Leia mais

Implementing and monitoring an. Open Access mandate: the Minho Experience

Implementing and monitoring an. Open Access mandate: the Minho Experience Implementing and monitoring an Open Access mandate: the Minho Experience Eloy Rodrigues eloy@sdum.uminho.pt Agenda Introduction University of Minho Open Access @UMinho Open Access Policy @UMinho: incentive

Leia mais

Procedure: Write on the board the words Human Rights. Ask students if they know how many are there in the Declaration written by UN.

Procedure: Write on the board the words Human Rights. Ask students if they know how many are there in the Declaration written by UN. Focus on activity: Human Rights Vocabulary Target audience (age): Ensino Médio Lesson link: Upgrade, Unit 23, Enem practice Aim: identifying specific ideas in the journalistic text, reviewing articles.

Leia mais

BIBLIOGRAFIA. Faupel, A. & Sharp, P. (2003). Promoting emotional literacy. Guidelines for schools, local authorities and

BIBLIOGRAFIA. Faupel, A. & Sharp, P. (2003). Promoting emotional literacy. Guidelines for schools, local authorities and RESUMO EXPANDIDO Pode definir-se Literacia Emocional como a capacidade para reconhecer, compreender, expressar e gerir estados emocionais, do próprio e de outras pessoas, existindo associações entre esta

Leia mais

METODOLOGIA DE AVALIAÇÃO DAS STARTUPS DO MIDI TECNOLÓGICO

METODOLOGIA DE AVALIAÇÃO DAS STARTUPS DO MIDI TECNOLÓGICO METODOLOGIA DE AVALIAÇÃO DAS STARTUPS DO MIDI TECNOLÓGICO RESUMO As incubadoras de empresas são ambientes dotados de competência gerencial, técnica e administrativa que impulsionam a promoção do nascimento

Leia mais

egovernment The Endless Frontier

egovernment The Endless Frontier CENTRO DE GESTÃO DA REDE INFORMÁTICA DO GOVERNO (Management Center for the Electronic Government Network) egovernment The Endless Frontier Alexandre Caldas 29 th June 2010 Summary VISION AND LEADERSHIP

Leia mais

Mestrado em Ciências Jurídicas Especialização em História do Direito 2015-16

Mestrado em Ciências Jurídicas Especialização em História do Direito 2015-16 Mestrado em Ciências Jurídicas Especialização em História do Direito Unidade curricular História do Direito Português I (1º sem). Docente responsável e respectiva carga lectiva na unidade curricular Prof.

Leia mais

PresentationoftheProject

PresentationoftheProject KNETWORKS Centro de Gestão da Rede Informática do Governo PresentationoftheProject A Coruña Seminar 28h January 2011 Prof. Alexandre Caldas Agenda AGENDA 1. Knowledge and Information Society - Guidelines

Leia mais

ACEF/1112/02477 Decisão de apresentação de pronúncia

ACEF/1112/02477 Decisão de apresentação de pronúncia ACEF/1112/02477 Decisão de apresentação de pronúncia ACEF/1112/02477 Decisão de apresentação de pronúncia Decisão de Apresentação de Pronúncia ao Relatório da Comissão de Avaliação Externa 1. Tendo recebido

Leia mais

2. HUMAN RESOURCES 2. RECURSOS HUMANOS 1 RECRUTAMENTO E SELECÇÃO 1 RECRUITMENT AND SELECTION 2 QUALIFICAÇÃO DOS TRABALHADORES

2. HUMAN RESOURCES 2. RECURSOS HUMANOS 1 RECRUTAMENTO E SELECÇÃO 1 RECRUITMENT AND SELECTION 2 QUALIFICAÇÃO DOS TRABALHADORES RECURSOS HUMANOS HUMAN RESOURCES . RECURSOS HUMANOS RECRUTAMENTO E SELECÇÃO. HUMAN RESOURCES RECRUITMENT AND SELECTION O recrutamento e a situação contratual, no ano em análise, e face ao anterior, caracterizaram-se

Leia mais

Online Collaborative Learning Design

Online Collaborative Learning Design "Online Collaborative Learning Design" Course to be offered by Charlotte N. Lani Gunawardena, Ph.D. Regents Professor University of New Mexico, Albuquerque, New Mexico, USA July 7- August 14, 2014 Course

Leia mais

OFFICE. Office Background

OFFICE. Office Background OFFICE Office Background Since it was founded in 2001, steady growth has been registered by the office in the Brazilian market of corporate law, a field in which our services are exemplary. The consolidation

Leia mais

Autor: Débora Saraiva de Melo Anversa 1 Co-Autores: Teresinha Rita Boufleuer 2 Franciele Pastre 3 Andreici Daiani Vedovatto 4 Ademar Tibola 5

Autor: Débora Saraiva de Melo Anversa 1 Co-Autores: Teresinha Rita Boufleuer 2 Franciele Pastre 3 Andreici Daiani Vedovatto 4 Ademar Tibola 5 Proposta de Desenvolvimento do Empreendedor na INCTECh: adequação à prática chave segundo a metodologia CERNE 1. Proposal for Entrepreneurial Development at INCTECh: suitability to practice key according

Leia mais

CONTRIBUTO DO DESIGN PARA A MODERNIZAÇÃO DOS SERVIÇOS PÚBLICOS PORTUGUESES. SEMINÁRIO INTERNACIONAL Lisboa, 19 de Junho de 2015

CONTRIBUTO DO DESIGN PARA A MODERNIZAÇÃO DOS SERVIÇOS PÚBLICOS PORTUGUESES. SEMINÁRIO INTERNACIONAL Lisboa, 19 de Junho de 2015 CONTRIBUTO DO DESIGN PARA A MODERNIZAÇÃO DOS SERVIÇOS PÚBLICOS PORTUGUESES SEMINÁRIO INTERNACIONAL Lisboa, 19 de Junho de 2015 Introdução (I) Apesar de em Portugal até ao momento não existirem exemplos

Leia mais

User interface evaluation experiences: A brief comparison between usability and communicability testing

User interface evaluation experiences: A brief comparison between usability and communicability testing User interface evaluation experiences: A brief comparison between usability and communicability testing Kern, Bryan; B.S.; The State University of New York at Oswego kern@oswego.edu Tavares, Tatiana; PhD;

Leia mais

Consultoria em Direito do Trabalho

Consultoria em Direito do Trabalho Consultoria em Direito do Trabalho A Consultoria em Direito do Trabalho desenvolvida pelo Escritório Vernalha Guimarães & Pereira Advogados compreende dois serviços distintos: consultoria preventiva (o

Leia mais

INFORMATION SECURITY IN ORGANIZATIONS

INFORMATION SECURITY IN ORGANIZATIONS INFORMATION SECURITY IN ORGANIZATIONS Ana Helena da Silva, MCI12017 Cristiana Coelho, MCI12013 2 SUMMARY 1. Introduction 2. The importance of IT in Organizations 3. Principles of Security 4. Information

Leia mais

WWW.ADINOEL.COM Adinoél Sebastião /// Inglês Tradução Livre 67/2013

WWW.ADINOEL.COM Adinoél Sebastião /// Inglês Tradução Livre 67/2013 PASSO A PASSO DO DYNO Ao final desse passo a passo você terá o texto quase todo traduzido. Passo 1 Marque no texto as palavras abaixo. (decore essas palavras, pois elas aparecem com muita frequência nos

Leia mais

MAUS TRATOS NA POPULAÇÃO IDOSA INSTITUCIONALIZADA

MAUS TRATOS NA POPULAÇÃO IDOSA INSTITUCIONALIZADA Universidade de Lisboa Faculdade de Medicina de Lisboa MAUS TRATOS NA POPULAÇÃO IDOSA INSTITUCIONALIZADA Catarina Isabel Fonseca Paulos Mestrado em Medicina Legal e Ciências Forenses 2005 Esta dissertação

Leia mais

CENTRO UNIVERSITÁRIO METROPOLITANO DE SÃO PAULO CURSO ADMINISTRAÇÃO DE EMPRESAS

CENTRO UNIVERSITÁRIO METROPOLITANO DE SÃO PAULO CURSO ADMINISTRAÇÃO DE EMPRESAS CENTRO UNIVERSITÁRIO METROPOLITANO DE SÃO PAULO CURSO ADMINISTRAÇÃO DE EMPRESAS UMA VANTAGEM COMPETITIVA COM A TERCEIRIZAÇÃO DE SERVIÇOS AMANDA ZADRES DANIELA LILIANE ELIANE NUNES ELISANGELA MENDES Guarulhos

Leia mais

Compartilhando Energia Humana. Sharing Human Energy

Compartilhando Energia Humana. Sharing Human Energy Compartilhando Energia Humana Sharing Human Energy A Chevron Brasil tem como estratégia e valor um plano de investimento social voltado para o incentivo à qualificação profissional e ao empreendedorismo

Leia mais

REAL ESTATE MARKET IN BRAZIL

REAL ESTATE MARKET IN BRAZIL REAL ESTATE MARKET IN BRAZIL JOÃO CRESTANA President of Secovi SP and CBIC National Commission of Construction Industry SIZE OF BRAZIL Population distribution by gender, according to age group BRAZIL 2010

Leia mais

Self-reported diabetes: a feasible solution for national surveys in developing countries as Brazil.

Self-reported diabetes: a feasible solution for national surveys in developing countries as Brazil. Self-reported diabetes: a feasible solution for national surveys in developing countries as Brazil. Valéria M. Azeredo Passos, Janaina Caldeira Pereira, Sandhi Maria Barreto INTRODUCTION Type 2 diabetes

Leia mais

O PAPEL DO SETOR PÚBLICO NO DESENVOLVIMENTO DO ECOSSISTEMA DE INVESTIMENTO SOCIAL

O PAPEL DO SETOR PÚBLICO NO DESENVOLVIMENTO DO ECOSSISTEMA DE INVESTIMENTO SOCIAL FOCUS GROUP O PAPEL DO SETOR PÚBLICO NO DESENVOLVIMENTO DO ECOSSISTEMA DE INVESTIMENTO SOCIAL 23 ABRIL 2015 PARTE I BOAS VINDAS Boas vindas da: AMP Área Metropolitana do Porto Boas vindas dos parceiros

Leia mais

Angola : business opportunities highlight

Angola : business opportunities highlight 13-01-2014 O Ministério da Energia e Águas da República de Angola, no âmbito do Plano de Desenvolvimento do Subsector Eléctrico de Angola alicerçado na Política e a Estratégia de Segurança Energética Nacional

Leia mais

ISO 9001:2015 e ISO 14001:2015 versão DIS Principais alterações

ISO 9001:2015 e ISO 14001:2015 versão DIS Principais alterações ISO 9001:2015 e ISO 14001:2015 versão DIS Principais alterações Raquel Silva 02 Outubro 2014 ISO 9001:2015 e ISO 14001:2015 ISO 9001:2015 e ISO 14001:2015 PUBLICAÇÃO DIS: - Draft International Standard

Leia mais

A tangibilidade de um serviço de manutenção de elevadores

A tangibilidade de um serviço de manutenção de elevadores A tangibilidade de um serviço de manutenção de elevadores Tese de Mestrado em Gestão Integrada de Qualidade, Ambiente e Segurança Carlos Fernando Lopes Gomes INSTITUTO SUPERIOR DE EDUCAÇÃO E CIÊNCIAS Fevereiro

Leia mais

Descrição das actividades

Descrição das actividades Proposta de Guião para uma Prova Grupo: Em Acção Disciplina: Inglês, Nível de Continuação, 11.º ano Domínio de Referência: O Mundo do Trabalho Duração da prova: 15 a 20 minutos Guião D 1.º MOMENTO Intervenientes

Leia mais

Interface between IP limitations and contracts

Interface between IP limitations and contracts Interface between IP limitations and contracts Global Congress on Intellectual Property and the Public Interest Copyright Exceptions Workshop December 16, 9-12:30 Denis Borges Barbosa The issue Clause

Leia mais

Easy Linux! FUNAMBOL FOR IPBRICK MANUAL. IPortalMais: a «brainware» company www.iportalmais.pt. Manual

Easy Linux! FUNAMBOL FOR IPBRICK MANUAL. IPortalMais: a «brainware» company www.iportalmais.pt. Manual IPortalMais: a «brainware» company FUNAMBOL FOR IPBRICK MANUAL Easy Linux! Title: Subject: Client: Reference: Funambol Client for Mozilla Thunderbird Doc.: Jose Lopes Author: N/Ref.: Date: 2009-04-17 Rev.:

Leia mais

IAIA 2014 - Impact Assessment for Social and Economic Development. Tuesday, April 8, 2014

IAIA 2014 - Impact Assessment for Social and Economic Development. Tuesday, April 8, 2014 IAIA 2014 - Impact Assessment for Social and Economic Development Tuesday, April 8, 2014 PPA Política e Planejamento Ambiental Ltda. Since 1991, works worldwide in the following areas: Consulting Environmental

Leia mais

CULTURAS, POLÍTICAS E PRÁTICAS INCLUSIVAS NO SECTOR PÚBLICO E PRIVADO UM ESTUDO DE CASO EM DUAS ESCOLAS DO 1.º CICLO, DO CONCELHO DE SINTRA

CULTURAS, POLÍTICAS E PRÁTICAS INCLUSIVAS NO SECTOR PÚBLICO E PRIVADO UM ESTUDO DE CASO EM DUAS ESCOLAS DO 1.º CICLO, DO CONCELHO DE SINTRA UNIVERSIDADE TÉCNICA DE LISBOA FACULDADE DE MOTRICIDADE HUMANA CULTURAS, POLÍTICAS E PRÁTICAS INCLUSIVAS NO SECTOR PÚBLICO E PRIVADO UM ESTUDO DE CASO EM DUAS ESCOLAS DO 1.º CICLO, DO CONCELHO DE SINTRA

Leia mais

A METHOD OF STRATEGIC MANAGEMENT AND PLANNING TO OBTAIN COMPETITIVENESS IN FARMING BUSINESS

A METHOD OF STRATEGIC MANAGEMENT AND PLANNING TO OBTAIN COMPETITIVENESS IN FARMING BUSINESS A METHOD OF STRATEGIC MANAGEMENT AND PLANNING TO OBTAIN COMPETITIVENESS IN FARMING BUSINESS Mr. Frederico Fonseca Lopes MARKESTRAT ffflopes@markestrat.org Ms. Janaína Gagliardi Bara USP / FEARP / MARKESTRAT

Leia mais

PRINCE2 FOUNDATION AND PRACTITIONER INNOVATIVE LEARNING SOLUTIONS WWW.PYLCROW.COM PORTUGAL - BRAZIL - MOZAMBIQUE

PRINCE2 FOUNDATION AND PRACTITIONER INNOVATIVE LEARNING SOLUTIONS WWW.PYLCROW.COM PORTUGAL - BRAZIL - MOZAMBIQUE PYLCROW Portugal LISBOA Email: info.pt@pylcrow.com Telefone: +351 21 247 46 00 http://www.pylcrow.com/portugal WWW.PYLCROW.COM PORTUGAL - BRAZIL - MOZAMBIQUE FOUNDATION AND PRACTITIONER INNOVATIVE LEARNING

Leia mais

CARLA ALEXANDRA SEVES DE ANDRADE CANOTILHO

CARLA ALEXANDRA SEVES DE ANDRADE CANOTILHO Escola Superior de Tecnologia e Gestão Instituto Politécnico da Guarda R E L AT Ó R I O D E AT I V I D A D E P R O F I S S I O N A L N A J. V A R G A S - G A B I N E T E T É C N I C O D E G E S T Ã O E

Leia mais

Abordagem modular e projectos horizontais Infoday Lisboa, Setembro 2015

Abordagem modular e projectos horizontais Infoday Lisboa, Setembro 2015 Abordagem modular e projectos horizontais Infoday Lisboa, Setembro 2015 um Eixo Prioritário territorial EIXO PRIORITÁRIO 1: Promover as capacidades de inovação no Mediterrâneo para o desenvolvimento sustentável

Leia mais

ELENA e Portugal 2020

ELENA e Portugal 2020 ELENA e Portugal 2020 Convenção Low Carbon de um Oeste Sustentável Dinis Rodrigues Caldas da Rainha, 9 de julho de 2013 AGENDA Tema 1 Portugal 2020 Tema 2 - ELENA 1 Compromissos Nacionais Metas UE-27 20%

Leia mais

Hidráulica Urbana. Urban Hydraulics. Semestre do plano de estudos 2

Hidráulica Urbana. Urban Hydraulics. Semestre do plano de estudos 2 Nome UC Hidráulica Urbana CU Name Código UC 725 Curso MEC Semestre do plano de estudos 2 Área científica Engenharia Civil Duração Semestral Horas de trabalho 164 ECTS 6 Horas de contacto T - 22,5; PL -

Leia mais

NCE/09/01342 Decisão de apresentação de pronúncia - Novo ciclo de estudos

NCE/09/01342 Decisão de apresentação de pronúncia - Novo ciclo de estudos NCE/09/01342 Decisão de apresentação de pronúncia - Novo ciclo de estudos NCE/09/01342 Decisão de apresentação de pronúncia - Novo ciclo de estudos Decisão de Apresentação de Pronúncia ao Relatório da

Leia mais

UNIVERSIDADE DE SÃO PAULO FACULDADE DE EDUCAÇÃO JOÃO FÁBIO PORTO. Diálogo e interatividade em videoaulas de matemática

UNIVERSIDADE DE SÃO PAULO FACULDADE DE EDUCAÇÃO JOÃO FÁBIO PORTO. Diálogo e interatividade em videoaulas de matemática UNIVERSIDADE DE SÃO PAULO FACULDADE DE EDUCAÇÃO JOÃO FÁBIO PORTO Diálogo e interatividade em videoaulas de matemática São Paulo 2010 JOÃO FÁBIO PORTO Diálogo e interatividade em videoaulas de matemática

Leia mais

Ficha de Unidade Curricular

Ficha de Unidade Curricular 6.2.1.1. Unidade curricular: Curricular Unit: Ficha de Unidade Curricular Comunicação Multimédia (Desenvolvimento) Multimedia Communication (Development) 6.2.1.2. Docente responsável e respectivas horas

Leia mais

Prevention and Control Against Excessive Alcohol Consumption at the Workplace

Prevention and Control Against Excessive Alcohol Consumption at the Workplace Portugal Country: Name of the project: Name of the company/organisation: kind of company Company size Portugal Prevention and Control Against Excessive Alcohol Consumption at the Workplace Estaleiros Navais

Leia mais

Efficient Locally Trackable Deduplication in Replicated Systems. www.gsd.inesc-id.pt. technology from seed

Efficient Locally Trackable Deduplication in Replicated Systems. www.gsd.inesc-id.pt. technology from seed Efficient Locally Trackable Deduplication in Replicated Systems João Barreto and Paulo Ferreira Distributed Systems Group INESC-ID/Technical University Lisbon, Portugal www.gsd.inesc-id.pt Bandwidth remains

Leia mais

CMDB no ITIL v3. Miguel Mira da Silva. mms@ist.utl.pt 919.671.425

CMDB no ITIL v3. Miguel Mira da Silva. mms@ist.utl.pt 919.671.425 CMDB no ITIL v3 Miguel Mira da Silva mms@ist.utl.pt 919.671.425 1 CMDB v2 Configuration Management IT components and the services provided with them are known as CI (Configuration Items) Hardware, software,

Leia mais

As Novas Formas de Financiamento da Economia

As Novas Formas de Financiamento da Economia As Novas Formas de Financiamento da Economia Francisco Fonseca Vice-Presidente ANJE 2º CONGRESSO DAS EMPRESAS E DAS ACTIVIDADES ECONÓMICAS - LISBOA O que são? Formas alternativas de financiamento incluem

Leia mais

Engenharia de Requisitos. Professor: Dr. Eduardo Santana de Almeida Universidade Federal da Bahia esa@dcc.ufba.br

Engenharia de Requisitos. Professor: Dr. Eduardo Santana de Almeida Universidade Federal da Bahia esa@dcc.ufba.br Engenharia de Requisitos Professor: Dr. Eduardo Santana de Almeida Universidade Federal da Bahia esa@dcc.ufba.br O Documento de Requisitos Introdução The requirements for a system are the descriptions

Leia mais

PRESS RELEASE. Mecanismos fiscais aos Business Angels sucedem-se um pouco por todo o mundo

PRESS RELEASE. Mecanismos fiscais aos Business Angels sucedem-se um pouco por todo o mundo PRESS RELEASE 8 de Dezembro de 2009 Mecanismos fiscais aos Business Angels sucedem-se um pouco por todo o mundo FNABA representou Portugal, em Pequim (China), na First Global Conference da World Business

Leia mais

Tese / Thesis Work Análise de desempenho de sistemas distribuídos de grande porte na plataforma Java

Tese / Thesis Work Análise de desempenho de sistemas distribuídos de grande porte na plataforma Java Licenciatura em Engenharia Informática Degree in Computer Science Engineering Análise de desempenho de sistemas distribuídos de grande porte na plataforma Java Performance analysis of large distributed

Leia mais

ISAMARA SEABRA O FINANCIAMENTO DAS PARCERIAS PÚBLICO- PRIVADAS NO BRASIL

ISAMARA SEABRA O FINANCIAMENTO DAS PARCERIAS PÚBLICO- PRIVADAS NO BRASIL UniCEUB Centro Universitário de Brasília Instituto CEUB de Pesquisa e Desenvolvimento Programa de Mestrado em Direito ISAMARA SEABRA O FINANCIAMENTO DAS PARCERIAS PÚBLICO- PRIVADAS NO BRASIL BRASÍLIA -

Leia mais

Sourcing Travel Management Services. Patrocinado por

Sourcing Travel Management Services. Patrocinado por Sourcing Travel Management Services Patrocinado por February 2009 Components Moderator: Ricardo Mandarino Santander, Brasil Panelists: Robert Suquet DuPont, América Latina Paulo Lima TSA, Brasil Federico

Leia mais

Enterprise Europe - Portugal

Enterprise Europe - Portugal Enterprise Europe - Portugal Oportunidades de Cooperação Internacional Agência de Inovação Bibiana Dantas Lisboa, 5-Jun-2012 Enterprise Europe Portugal Jun 2012 2 A União Europeia é um mercado de oportunidades!

Leia mais

SAÚDE GLOBAL, SAÚDE DAS POPULAÇÕES E DETERMINANTES SOCIAIS / GLOBAL HEALTH, POPULATION HEALTH AND SOCIAL DETERMINANTS

SAÚDE GLOBAL, SAÚDE DAS POPULAÇÕES E DETERMINANTES SOCIAIS / GLOBAL HEALTH, POPULATION HEALTH AND SOCIAL DETERMINANTS SAÚDE GLOBAL, SAÚDE DAS POPULAÇÕES E DETERMINANTES SOCIAIS / GLOBAL HEALTH, POPULATION HEALTH AND SOCIAL DETERMINANTS 1. Unidade curricular: Saúde global, saúde das populações e determinantes sociais /

Leia mais

Software product lines. Paulo Borba Informatics Center Federal University of Pernambuco

Software product lines. Paulo Borba Informatics Center Federal University of Pernambuco Software product lines Paulo Borba Informatics Center Federal University of Pernambuco Software product lines basic concepts Paulo Borba Informatics Center Federal University of Pernambuco Um produto www.usm.maine.edu

Leia mais

Desenvolvimento Ágil 1

Desenvolvimento Ágil 1 Desenvolvimento Ágil 1 Just-in-Time Custo = Espaço + Publicidade + Pessoal De que forma poderiamos bater a concorrência se um destes factores fosse zero? 2 Just-in-time Inventory is waste. Custo de armazenamento

Leia mais