Advantages of Port Lobito



Documentos relacionados
DEMONSTRATIVO DE CÁLCULO DE APOSENTADORIA - FORMAÇÃO DE CAPITAL E ESGOTAMENTO DAS CONTRIBUIÇÕES

PRÓ-TRANSPORTE - MOBILIDADE URBANA - PAC COPA CT /10

PRÓ-TRANSPORTE - MOBILIDADE URBANA - PAC COPA CT /10

Its structure focuses on servicing the Oil and Gas market, including:

DELEGACIA REGIONAL TRIBUTÁRIA DE

Safra 2016/2017. Safra 2015/2016

TABELA PRÁTICA PARA CÁLCULO DOS JUROS DE MORA ICMS ANEXA AO COMUNICADO DA-46/12

GDOC INTERESSADO CPF/CNPJ PLACA

DATA DIA DIAS DO FRAÇÃO DATA DATA HORA DA INÍCIO DO ANO JULIANA SIDERAL T.U. SEMANA DO ANO TRÓPICO

Data Moeda Valor Vista Descrição Taxa US$ 07-Jul-00 Real 0,5816 Sem frete - PIS/COFINS (3,65%) NPR 1,81 14-Jul-00 Real 0,5938 Sem frete - PIS/COFINS

TABELA PRÁTICA PARA CÁLCULO DOS JUROS DE MORA ICMS ANEXA AO COMUNICADO DA-87/12

Associação Comercial de São Paulo Outubro, 2012

UMA SAÍDA PARA O MUNDO YOUR GATEWAY TO THE WORLD

INDRA: EMPRESA MULTINACIONAL DE INOVAÇÃO

RECALL SMITHS LISTA DOS PRODUTOS ENVOLVIDOS, IMPORTADOS AO BRASIL PELA CIRÚRGICA FERNANDES, COM INFORMAÇÕES SOBRE PRODUTOS VENDIDOS E EM ESTOQUE

7 º Seminário Internacional de Logística Agroindustrial. Mecanismos de redução de custos logísticos de exportação Algodão

REGULAMENTO DE TARIFAS

The Best Business Opportunity with High Return on Investment

O Caso LS: Equipamento e Comportamento, os pilares da estratégia de Eficiência Energética

TABELA DE PREÇOS E CONDIÇÕES COMERCIAIS ESTRUTURA DE SERVIÇOS E PREÇOS

Kamsar Container Terminal and Barge Unloading Facility- Port of Kamsar

Estatísticos. Dados PORTO DO LOBITO MOVIMENTA 2,2 MILHÕES DE TONELADAS. 83 Anos

TRANSPORTES marítimos E aéreos nos açores. Direcção Regional dos Transportes Aéreos e Marítimos

Valores de ATR e Preço da Tonelada de Cana-de-açúcar - Consecana do Estado de São Paulo

Transporte de mercadorias aumenta por via rodoviária e marítima

CENTRAL COMISSION FOR THE NAVIGATION OF THE RHINE

Com estrutura voltada para atendimento no mercado de Óleo e Gás contemplando:

Vênus Em Aquário 25 Dez Vênus Em Peixes 18 Jan Vênus Em Áries 12 Fev Vênus Em Touro 8 Mar Vênus Em Gêmeos 4 Abr 1940

We connect your goods to the World

PROCESSO DE OPERAÇÃO Nº TF REV 01 PORTO DO AÇU FOLHA: 1 DE 5

Global forwarding: ao serviço da supply chain

LEVAMOS O SEU NEGÓCIO A BOM PORTO. BRINGING YOUR BUSINESS TO SAFE HARBOUR.

Fazendo a diferença para sempre fazer melhor

ABM - 44º Seminário de Aciaria Internacional. Fatores Críticos de Engenharia e Projeto na Indústria Siderúrgica PLANEJAR PARA EXECUTAR

Portos de Pesca de Maputo e Beira. Frigorificação de Pescado e Venda de Gelo. Utilizações Nacionais e Estrangeiras 1 1

AEROPORTO INTERNACIONAL DE CABO FRIO UMA NOVA OPÇÃO LOGÍSTICA

RELATÓRIO DE ACOMPANHAMENTO DA EXECUÇÃO FINANCEIRA

Visão Ser o porto de referência para as cadeias logísticas da costa leste de África.

Fazendo a diferença para sempre fazer melhor

AIS SUPERPESA CIA DE TRANSPORTES TES ESPECIAIS E INTERMODAIS

Alturas mensais de precipitação (mm)

ESTALEIRO EISA MOMENTO ATUAL E PERSPECTIVAS APIMEC 26/03/2013

Fonte: Terminais Portuários e Logística

Cyclic loading. Yield strength Maximum strength

Série 34 E 35 Relatório de Acompanhamento do CRI 31-jan-14

Atividade dos Transportes 1º Trimestre de 2015

SUPLEMENTO AO DIPLOMA DA UNIVERSIDADE DO MINHO MESTRADO EM DESIGN E MARKETING (2º CICLO)

Nome do Condomínio. Demonstrativo Financeiro

LIVRO DE TARIFAS PORTUÁRIAS

SEPETIBA TECON. VISÃO GERAL Localização estratégica Ficha técnica/ Equipamento One-Stop-Shop

FEMAR 137 de 20/MAI/ /MAI/2017 CIAGA FEMAR. FATEC-JAHU 169 de 17/JUL/ /JUL/2016 CFTP

Atividade dos Transportes

SUPLEMENTO AO DIPLOMA DA UNIVERSIDADE DO MINHO MESTRADO EM CONSTRUÇÃO E REABILITAÇÃO SUSTENTÁVEIS (2º CICLO)

DEFINIÇÃO. O South Atlantic FANS Interoperability Team (SAT/FIT) foi estabelecido para supervisionar e monitorar o desempenho do

REAL ESTATE MARKET IN BRAZIL

ÍNDICE. Movimento Geral. General throughput. Pág.3. NAVIOS entrados segundo o tipo. Incoming ships by type. Pág.4

Simulação da Carga Movimentada Num Terminal Intermodal

OPERAÇÕES DE FRETE/2011

M V O I V M I E M N E T N O T O D E D E C A C R A G R A G A E E D E D E N A N V A I V O I S O

EVOLUÇÃO SALARIAL. Categoria: Sindipetro RJ. Petroleiros do Rio de Janeiro. Deflatores: IPCA-IBGE INPC-IBGE. julho de 2012

Relatório de Débito Atualizado Monetariamente - Cálculo até 07/11/2016

Março/2008 Certificação do ISPS Code. Maio/ milhões de TEUs movimentados LINHA DO TEMPO

Extrato de Unidade. Período de 01/01/1901 até 22/06/ COND.JULHO/2007(50%) 162, FUNDO DE RESERVA 18, COND.

Tabela de preços pag 1. Atracação. TABELA B Tarifa de operação por conteiner Preço (R$)

Atualização de $ 602,77 de Abr-2006 para Mai-2011 pelo índice INPC. Valor atualizado: $ 784,48

Janela Única Logís/ca. José Pedro Soares Administrador APS Administração dos Portos de Sines e do Algarve, S.A. 2015/06/25

AUMENTO DE PRODUTIVIDADE DA FROTA DE CAMINHÕES RODOVIÁRIOS COM A PADRONIZAÇÃO DE CARGAS MINERAÇÃO PARAGOMINAS S.A.

Fundada em 29 de novembro de 1976, a ABTTC congregava empresas que atuavam no seguimento de transporte rodoviário de contêineres Passados 33 anos, a

APRESENTAÇÃO E TRABALHOS DESENVOLVIDOS

PTTMetro BRAZIL - IXP - Update

Lista dos Consultores e Especialistas

City of Curitiba Institute for Research and Urban Planning of Curitiba

Apenas para referência. Serviços de transporte marítimo CEPA. Sector ou. 11. Serviços de Transporte. Subsector. A. Serviços de transporte marítimo

M V O I V M I E M N E T N O T O D E D E C A C R A G R A G A E E D E D E N A N V A I V O I S O

LOCALFRIO S.A. ARMAZÉNS GERAIS FRIGORÍFICOS

LOCALFRIO S.A. ARMAZÉNS GERAIS FRIGORÍFICOS

ADVOCACIA GERAL DA UNIAO Procuradoria Geral da Uniao Departamento de Calculos e Pericias - DECAP ( NECAP NO ESTADO DO

International Projects Logistics

Transporte Marítimo e Fluvial: Necessidades e Oportunidades de Investimentos

PESQUISA MENSAL DO COMERCIO VAREJISTA DA REGIÃO METROPOLITANA DE FORTALEZA (CE) - MARÇO

TARIFA DO PORTO DE SUAPE

Atividade dos Transportes 4º Trimestre de 2014

Instituto de desenvolvimento educacional de Angola IDEIA SECRETARIA ACADÊMICA

Panorama do setor Marítimo. Panorama do setor Marítimo. Panorama do setor Marítimo. Panorama do setor Marítimo. Panorama do setor Marítimo

ÍNDICE NACIONAL DE CUSTOS DO TRANSPORTE CARGA LOTAÇÃO

ANÁLISE DO MOVIMENTO FÍSICO DO PORTO DE SANTOS

Mês de referência JUNHO 2014 INCTL OUT/03 = 100. Muito curto 50 51,05 172,06 6,33 3,50 (0,3003) Curto ,97 174,77 5,81 2,98 (0,1306)

Por tonelada líquida de registro (TLR) de embarcação destinada ao transporte de passageiros, turismo e recreio, na área do Porto Organizado

Agenciamento de Cargas Importação Marítima

Kamsar Container Terminal and Barge Unloading Facility - Port of Kamsar

O transporte de passageiros aumentou por via ferroviária (+3,7%) e por metropolitano (+6,3%).

INVESTIMENTOS NO INTERIOR PAULISTA

Calendário Pós-graduação MBA em Gestão de Projetos

O Presente e o Futuro da Segurança no Cuidado ao Paciente Resultados da Acreditação no Novo Cenário Econômico e Populacional

EVOLUÇÃO DO TRANSPORTE MARÍTIMO E O SEU IMPACTO NA INFRA-ESTRUTURA PORTUÁRIA EXECUÇÃO 2013

Bancos financiam crescentemente a produção

SUPLEMENTO AO DIPLOMA DA UNIVERSIDADE DO MINHO (MESTRADO EM ENGENHARIA URBANA) (2º CICLO)

Vistoria Básica para Confêrentes

Passenger cabotage transport in Brazil: it is "trade or navigation in Brazilian coastal waters.

IT 204 Análise Operacional e Gerencial de Aeroportos Prof. Carlos Müller sala 2134 (muller@ita.br) 1 º semestre / 2014 Versão 2 Programa:

Transcrição:

Advantages of Port Lobito (1) Predominant geological locations Facing the Atlantic, Port Lobito locates around 30km north to Benguela City, and it is the main seaport in the middle of Angola.

(2) Favorable onshore transportation system LOBITO LUANDA LOBITO NAMIBE

(3) Excellent natural conditions Well sheltered by a natural sand bar; Excellent water depth inside the bay; Mass undeveloped land for port development; Well municipal supporting nearby; Fantastic beach for tourism.

Development Target (1) A hinge of land/water transportation for middle south of Angola, even for the inland neighbors; (2) A big port with advanced infrastructure and modern handling equipments; (3) A center port of luxury cruise for middle south of Angola; (4) Port Lobito should be able to import the general cargo and containers, export the minerals, also transport the incoming crude oil and outgoing refined oil for the proposed refinery.

Plan of time implementation It is suggested that Port Lobito should be improved to a preliminary modern port in 3.5 years, which is arranged in three steps including rehabilitation works, extension works and updating works. 1 st stage: to rehab the existing quays in one year; 2 nd stage: to make the overall plan of Lobito Port and fulfill the Phase I Extension Work in 2 years; 3 rd stage: to update the existing quay area in one year.

No. Project 1 2 3 The Rehabilitation Work of Existing Berths The Phase I Extension Work The Updating Work of Existing Berths First Year Second Year Third Year Fourth Year Duration Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 12 months 24 months 12 months

1 st Stage: Rehab the existing quay

ITEMS OF REHABILITATION (1) Install/replace the rubber fenders and bollards to improve the safety of docking and mooring;

(2) Rehab the damaged part of maritime structure crashed by ship recently, and repair/replace the deteriorated components of structure.

(3) Repave the apron and stacking yard;

(4) Repair and update the port accessorial supporting system such as water, electric, fuel oil, communication, navigation and warehouse, etc. (5) Navigation Aids; (6) Update the handling equipments 2 sets(40t) 2 sets(16t) 1 set(8t)

2 nd Stage: Master Plan and Phase I Extension Project of Lobito Port

Throughput forecast for Lobito Port Year 2010 2015 2020 Remark General cargo (import) Container (import) 400,000 600,000 1,000,000 100,000 200,000 400,000 Bulk cargo (export) 550,000 (3,550,000) 820,000 (5,820,000) 1,000,000 (9,000,000) Including iron ore (NOT including iron ore) Crude oil (import) 10,000,000 12,000,000 Product (export) road railway waterway 500,000 500,000 1,000,000 1,500,000 8,500,000 10,000,000

Vessel type selected Vessel type Short term Load capacity (DWT) LONG TERM General cargo vessel 20,000~30,000 20,000~30,000 Bulk cargo vessel 50,000 / 100,000 70,000 / 250,000 Container vessel 50,000(The fourth generation) 70,000 (The fifth generation)

Master Plan of Port LobitoOption 1 Oil terminal Lobito bay Luxury Luxury cruise cruise terminal terminal Yacht Yacht club club Container terminal Bulk cargo Terminal Multipurpose terminal

Bulk Bulk cargo cargo terminal terminal Master Plan of Port LobitoOption 2 Luxury Luxury cruise cruise terminal terminal Yacht Yacht club club Oil terminal Lobito bay Multipurpose terminal Container terminal

Phase I Extension Work in Option 1 It is planned to build a container and general cargo berth and a bulk and general cargo berth for the extension works of option 1. Berth Container and general cargo Bulk and general cargo Design Item Water Area Quay Length Marine Structure Water Area Quay Length Design Vessel Type 30,000DWT general cargo vessel 50,000DWT container vessel 70,000DWT container vessel 50,000DWT bulk cargo vessel 70,000DWT bulk cargo vessel Marine Structure 70,000DWT bulk cargo vessel

General layout of Option 1 Container and general cargo berth Bulk and general cargo berth

Plan of container and general cargo berth 360 m Container and general cargo berth 11.7 m (14.7m)( 205,200m 2

Handling technology of container and general cargo berth Portal crane Multipurpose portal crane Railmounted Gantry Crane Rubbertyred gantry crane Container reach stacker Empty container stacker Forklift Rubbertyred mobile crane

The throughput: 440,000 tons and 118,000 TEUs annual.

) LIEBHERR

Plan of bulk and general cargo berth 330 m Bulk and general cargo berth 13.7 m (14.7m)( 188,100m 2

Handling technology of bulk and general cargo berth Portal crane Multipurpose portal crane StackerReclaimer Screw train unloader Forklift Rubbertyred mobile crane

Handling technology of general cargo berth in the future Special container berth The throughput: 350,000 TEUs annual. Rubbertyred gantry crane Quayside container crane Empty container stacker

The throughput: 270,000 tons general cargo and 730,000 tons bulk cargo annual.

Phase I Extension Work in Option 2 It is planned to build a multipurpose berth and a bulk cargo berth for the extension works of option 2. Berth Multipurpose Design Item Water Area Quay Length Marine Structure Design Vessel Type 30,000DWT general cargo vessel 50,000DWT container vessel 70,000DWT container vessel Bulk Cargo Water Area Quay Length Marine Structure 100,000DWT bulk cargo vessel 250,000DWT bulk cargo vessel 250,000DWT bulk cargo vessel

General layout of Option 2 Bulk Bulk cargo cargo berth berth Multipurpose berth

Plan of multipurpose berth 360 m Multipurpose berth 11.7 m (14.7m) 205,200m 2

Handling technology of multipurpose berth

Handling technology of multipurpose berth in the future Special container berth

Plan of bulk cargo berth 426m Bulk cargo quay 15.0m(21.2m) 174,000m 2 (270,000m 2 )

Handling technology of bulk cargo berth Screw train unloader Stackerreclaimer reclaimer Ship loader

The throughput: 3,800,000 tons annual at the beginning, And 12,670,000 tons annual in the future.

Pilebeam beamslab structure (steel pipe pile)

Caisson structure The recommendation of maritime structure should be determined finally according to the detailed geological data

3 rd : Updating of the Existing Quay

We plan to reconstruct the existing north and south quay based on the Master Plan after Phase I extension project is finished The north quay will be updated for luxury cruises The south quay will be rebuild as multipurpose terminal

TRAFICO DE NAVIOS Durante o ano de 2006 escalaram ao Porto do Lobito 829 Navios para efeitos de operações comerciais, na seguinte composição: 647 Navios de Longo Curso, 69 Navios Petroleiros, 75 navios Pesqueiros e 13 Navios de Cabotagem Movimento de NAvios 2006 MÊS Navios p/categoria Jan Fev Mar Abr Mai Jun Jul Ago Set Out Nov Dez Total Navios/Longo Curso 30 20 36 28 31 26 30 30 32 29 36 27 355 Navios/ Cabotagem 3 6 7 6 10 07 8 8 11 7 12 14 99 Navios /Tanques 5 6 6 4 7 07 4 7 5 5 7 7 70 Rebocadores 27 22 21 18 18 14 13 14 12 7 13 9 188 Nav./Pesqueiros 8 13 9 5 13 16 15 11 10 10 4 3 117 SOMA 73 67 79 61 79 70 70 70 70 58 72 60 829

Movimento de Navios JaneiroAbril/2007 JAN FEV MAR ABR TOTAL Longo Curso Nacionais Longo Curso Estrangeiros 31 30 25 29 115 Petroleiros Estrangeiros 6 2 4 5 17 Butaneiros 3 2 2 2 9 Pesqueiros Estrangeiros 7 1 8 Frigoríficos 2 2 4 Cabotagem Nacionais 1 1 1 1 4 Cabotagem Estrangeiros 1 2 7 4 14 Petroleiros Nacionais Rebocadores 17 17 17 14 65 Pesqueiros Nacionais 3 3 Outros 8 7 5 7 27 TOTAL 72 68 61 65 266

TRÁFEGO DE MERCADORIAS O manuseamento de cargas durante o período em análise cifrouse em 1.337.753 Toneladas (+ 312.577 Tons em relação ao ano anterior) na seguinte composição: 163.190 Toneladas embarcadas e 174.563 Toneladas desembarcadas. A produção realizada superou as previsões que apontavam para o manuseamento de 1.200.000 Toneladas de mercadoria diversa. A produtividade média foi de 1200 à 1500 Toneladas por Navio dia. A média de permanência para os Navios de Longo Curso foi de 2,3 dias. Tonelagem Movimentada em 2006 MÊS VARIANTE JAN. FEVER. MAR. ABRIL MAIO JUN. JUL. AGO. SET. OUT. NOV. DEZ. TOTAL L.Curdescarga direct 42.888 8.805 43.784 31.146 24.908 37.050 26.335 17.289 31.517 38.878 45.173 38.404 386.177 L. Cur desc indirecta 44.218 25.778 41.564 32.021 41.334 36.285 30.854 39.969 42.790 41.899 31.159 45.364 453.235 Carga Directo 32 264 516 8 690 1.510 L. Cur c. indirecta. 10.356 14.977 6.392 4.575 7.288 6.644 8.150 7.071 5.518 5.133 8.751 8.856 93.701 Cabot. desc. directa. 22 31 548 52 263 62 80 124 1.182 Cabot. Indirecta 2.058 1.338 1.279 341 1.162 522 2.448 150 869 1.264 1.078 1.128 13.637 Carreg. Directo 250 47 350 380 262 5 224 44 9 1.571 carreg indirecto 4.744 4.690 7.899 7.246 3.474 5.708 3.318 7.569 8.126 4.611 3.226 6.026 66.637 Descarga. Combust. 10.139 12.442 36.500 20.900 54.652 18.144 35.233 23.800 37.500 10.803 20.969 24.454 305.536 Descarga de Gás 1.300 1.100 1.000 994 633 2.130 400 1.500 1.100 1.100 2.200 1.100 14.565 SOMA 115.953 69.199 138.831 98.151 133.713 106.80 4 107.741 97.356 127.482 103.688 112.680 126.155 1.337.753

Tonelagem Movimentada em 2005/2006 312.577 1.337.753 1.025.176 TOTAL 46.155 126.155 80.000 Dezembro 21.891 112.680 90.789 Novembro 20.028 103.688 83.660 Outubro 33.108 127.482 94.374 Setembro 9.591 97.356 87.765 Agosto 28.952 107.741 78.789 Junho 35.095 106.804 71.709 Junho 53.705 133.713 80.008 Maio 15.018 98.151 83.133 Abril 68.528 138.831 70.303 Março 39.599 69.199 108.798 Fevereiro 20.105 115.953 95.848 Janeiro 2006 2005 DIFERENÇA ANO MÊS

TRÁFEGO DE CONTENTORES A contentorização representou o maior nível do total de carga movimentada, como resultado do manuseamento de 51.782 contentores, representando um aumento de mais de 10.984 contentores em relação ao período homólogo anterior em que foram manuseados 40.667 contentores. Destes contentores, 20.000 referemse a operação de desembarque, enquanto que 18.324 contentores foram embarcados e 12.543 entregues aos proprietários. No final do ano encontravamse parqueados no recinto portuário 2.340 contentores cheios e 1.246 contentores vazios, totalizando 3.586 contentores. Movimento de Contentores 2006 Mês Desembarcados Embarcados Entregues Total Jan 1.554 777 789 3.120 Fev 1.103 1.333 802 3.238 Mar 2.043 1.838 817 4.698 Abr 1.342 1.181 820 3.343 Mai 1.640 1.458 1.176 4.274 Jun 1.879 1.567 1.125 4.571 Jul 1.833 1.317 1.128 4.278 Ago 1.864 1.775 1.368 5.007 Set 2.200 2.362 920 5.482 Out 1.791 1.213 1.208 4.212 Nov 1.683 2.100 1.182 4.965 Dez 1.983 1.403 1.208 4.594 SOMA 20.915 18.324 12.543 51.782

Movimento de Contentores JaneiroAbril/2007 18.049 6.637 4.672 1.718 4.312 1.561 4.311 1.685 4.754 1.673 Vazios 145.392 7.673 32.934 1.891 37.784 1.866 36.657 1.965 38.017 1.951 Cheios 163.441 14.310 37.606 3.609 42.096 3.427 40.968 3.650 42.771 3.624 TOTAL (EMB+DESEM. 2.110 946 393 179 585 264 781 349 351 154 Vazios 119.004 6.221 27.768 1.548 29.639 1.459 30.039 1.600 31.558 1.614 Cheios 121.114 7.167 28.161 1.727 30.224 1.723 30.820 1.949 31.909 1.768 DESEMBARCADOS 15.939 5.691 4.279 1.539 3.727 1.297 3.530 1.336 4.403 1.519 Vazios 26.388 1.452 5.166 343 8.145 407 6.618 365 6.459 337 Cheios 42.327 7.143 9.445 1.882 11.872 1.704 10.148 1.701 10.862 1.856 EMBARCADOS TON NUM. TON NÚM. TON NÚM TON NÚM. TON NÚM. TOTAL ABRIL MARÇO FEVEREIRO JANEIRO