Government Characterization

Documentos relacionados
20 i=5% TELHA SANDUÍCHE. i=5% CALHA. i=5% TELHA SANDUÍCHE TELHA SANDUÍCHE. CALHA i=25% CALHA TELHA SANDUÍCHE. i=5% CALHA. i=5% TELHA SANDUÍCHE IDOSO

P1 E P2 ESQUADRIAS MEDICINA NUCLEAR PLANTA PLANTA CORTE CORTE VISTA VISTA P2 ESCALA 1:25 P1 ESCALA 1:25 1/31

Gabinete de Promoção dos Programa Quadro ID&I. The Portuguese NCP System. Mafalda Dourado CCDR-LVT. Gabinete de Promoção dos Programa Quadro ID&I

MEMORIAL DESCRITIVO REFORMA E ADAPTAÇÃO DO 2 PELOTÃO/2 CIA DO 5º BATALHÃO DO CBMMG PARA IMPLANTAÇÃO DE BASE DESCENTRALIZADA DO SAMU - 192

MEMORIAL DESCRITIVO ESPECIFICAÇÕES TÉCNICAS DE ACABAMENTOS BALTIMORE OFFICE PARK CLIENTE DATA: 27/10/2011 VERSÃO:

ED MONTREAL. Memorial descritivo dos acabamentos:

The Current Situation of Water Supply and Business Opportunties in Pernambuco, Brazil

Lucas Figueiredo Gonçalves

ANEXO I PARTE A ANTEPROJETO DE LEI ITABUNA IMPOSTO PREDIAL E TERRITORIAL URBANO IPTU. VALOR DO m² PARA CÁLCULO DO VALOR PREDIAL

Fórum Permanente de Micro e Pequenas Empresas. Comitê de Comércio Exterior. Brasília Julho de 2011

ESPECIFICAÇÕES DO EMPREENDIMENTO TÉRREO

ED MALIBU. Memorial descritivo dos acabamentos:


Technical Reporting Requirements

MEMORIAL DESCRITIVO REFORMA E ADAPTAÇÃO PARA IMPLANTAÇÃO DA CENTRAL DE REGULAÇÃO DO SAMU NA ÁREA DE TELEATENDIMENTO DA 9ª RISP

Medição das TICs no Brasil A visão dos usuários dos indicadores

Especificação Unid. Fornecedor Marca Ofer. Descto. (%) Preço Unitário ROCHA MOVEIS PROJETADOS PARA ESCRITORIO LTDA (12414)

CONSTRUÇÃO DA VARA DO TRABALHO DE PALMAS TRIBUNAL REGIONAL DO TRABALHO 9 REGIÃO RESUMO CONCORRÊNCIA N. 001/2014

CONDOMÍNIO RESERVA DA BARRA. Memorial Descritivo dos Acabamentos

PB LAYOUT escala 1/75

Gerência de Projetos e o Processo de Certificação

Catálogo casa de banho l WC accessories. gestos que apetecem l tempting gestures

Casas das Oliveiras Rua do Molhe, Nevogilde Foz

SISTEMA ROTARY-YEP.NET MANUAL DO COORDENADOR DE ÁREA

Local & Regional Development. Expanding the positive impacts of mining projects

Montagem Plus (10,00 x 10,00m) 100m 2

REAL ESTATE MARKET IN BRAZIL

Faturamento /2008 Revenue /2008

egovernment The Endless Frontier


Resultados 1T12 Crescendo em Ritmo Acelerado!

MEMORIA DE CÁLCULO. total 32,08

Universidade do Minho. Escola de Engenharia. UC transversais Programas Doutorais 1º semestre de outubro 2012

MEMORIAL DESCRITIVO. MARCO ZERO MIX - WORK Avenida Kennedy, São Bernardo do Campo - SP

ESTADO DE MATO GROSSO SECRETARIA DE SEGURANÇA PÚBLICA DEPARTAMENTO ESTADUAL DE TRÂNSITO MEMORIAL DESCRITIVO 40ª CIRETRAN PRÉDIO-SEDE

T3 105 M M2 DECK 28 M2 GARAGEM

MAPA DE TRABALHOS Artº Designação Unid. Quant. P. Unit. Total

Portas Tipo A DT_02.1.A. Esquadrias. Data 20/12/15. Folha 1/1

ED ANTÔNIO CARLOS. Memorial descritivo dos acabamentos:

Acquisition of Faculdade Nossa Cidade FNC

MEMORIAL DESCRITIVO REFORMA E ADAPTAÇÃO DO 2 PEL / 4 CIA DO 5 BATALHÃO DO CBBMG PARA IMPLANTAÇÃO DE BASE DESCENTRALIZADO DO SAMU

PLANTA DE VIGAMENTO DA COBERTURA ESCALA :1/125

ED. PORTO DI RAVENNA MEMORIAL DESCRITIVO

Project Management Activities

Passenger cabotage transport in Brazil: it is "trade or navigation in Brazilian coastal waters.

Rua Dante Francisco Zattera, Quadra 4907, lote 14, Loteamento Cidade Nova II. Bairro Distrito Industrial Caxias do Sul RS

LIPOR em contactos com o Qatar

1.20 Carga manual de entulho m³ 0, Expurgo do material proveniente das demolições m³ 0,32

ED MONTE VERDE. Memorial descritivo dos acabamentos:

MEMORIAL DESCRITIVO PORTARIA / GARAGEM

PLANILHAS DE SERVIÇOS E QUANTIDADES

Portugal ID Portugal BI. dossiers. Economic Outlook Conjuntura Económica. Last Update Última Actualização:

REFERENCIA : SEINFRA TB 22: 2014 COM DESONERAÇÃO 22,40%

Montagens Padronizadas Booth Services

Subject: The finance source/ new application/ project submission form COMPANY / PROJECT INFORMATION. Date of Submission: Registered Company Name

ED SANTA FÉ. Memorial descritivo dos acabamentos:

2014 World Cup FIFA Brazil

Acústica em Reabilitação de Edifícios

Foreign Trade Promotion for German Small and Medium-Sized Enterprises (SMEs) in Brazil

MEMORIAL DESCRITIVO DE ACABAMENTOS

PONTÍFICIA UNIVERSIDADE CATÓLICA DE GOIÁS ESCOLA DE ENGENHARIA CIVIL ESCADAS E MARQUISES

ARBORIA STUDIOS & RESIDENCE

Eduardo Beira. Eduardo Beira (MIT Portugal Program, U. Minho, Portugal)

Schmidt, Valois, Miranda, Ferreira & Agel - Advogados

Geospatial Information for Integration and Development in Rio de Janeiro. Luiz Roberto Arueira City Information Director Marcus Silva GIS Consultant

MEMORIAL DESCRITIVO PROPRIETÁRIO

SUPLEMENTO AO DIPLOMA DA UNIVERSIDADE DO MINHO MESTRADO EM CONSTRUÇÃO E REABILITAÇÃO SUSTENTÁVEIS (2º CICLO)

MEMORIAL DESCRITIVO Agosto/2007

MEMORIAL DESCRITIVO REFORMA E ADAPTAÇÃO DO 5º BATALHÃO DO CBMMG PARA IMPLANTAÇÃO DE BASE DESCENTRALIZADA DO SAMU - 192

PREMIUM OFFROAD ACCESSORIES ABOUT AFN OUR PRODUCTS RESEARCH AND DEVELOPMENT PRODUCTION FINISHING ASSEMBLY WAREHOUSE TECHNOLOGY

Iniciação ao software SIG Open Source WinGRASS Maio 2010 Lisboa Cristina Catita, FCUL

CAIXILHOS PARA PORTAS DE CORRER EMBUTIDAS ESPESSURA. PAREDE ACABAMENTO (mín)* 96. PORTA (máx.) INTERIOR CAIXILHO EXTERIOR CAIXILHO TIPO DE ACABAMENTO

SUPLEMENTO AO DIPLOMA DA UNIVERSIDADE DO MINHO (MESTRADO EM ENGENHARIA URBANA) (2º CICLO)

MEMORIAL DESCRITIVO ÁREAS DE LAZER

D INTERRUPTOR CAMPANHIA ACIONADOR MANUAL (ALARME) ESCADA 1.20

ESTRUTURA. Atualmente a A. J. Rorato conta. com um moderno parque. industrial, onde mais de colaboradores operam. equipamentos de última

Armários Redes Estruturadas 2010

MÓDULO QVD. 02 MÓDULO QVU. 02. Variável. piso ao teto com. rodapé eletrificável. Duplo. único. Variável MÓDULO QVD. 04 MÓDULO QVU.

LorenStilo C95 Misturador Lavatório C84 Torneira Lavatório C84 Torneira Lavatório. lançamento C67 Monomix Lavatório 4877 C67

LANÇAMENTO. ualitysol O R T A S E J A N E L A S D E A Ç O

Residencial Geraldo Pacheco

// gaiato private label

Currículo de Obras. Tecnologia V.E.S (vidro Encapsulado em Silicone)

Imprensa Oficial da Estância de Atibaia Sábado, 7 de setembro de nº Ano XVII - Caderno C - Volume V de V

ED. L ÉCRIN RESIDENSE

ED MANDALA. Memorial descritivo dos acabamentos:

MUNÍCIPIO DE CONSELHEIRO LAFAIETE - MG SECRETARIA MUNICIPAL DE OBRAS E MEIO AMBIENTE Administração 2.013/2.016 TERMO DE REFERENCIA

Participatory Map of Rio de Janeiro

DECRETO Nº 1627 DE 25 DE FEVEREIRO DE 2015

01/04/2012. EMEI Pedro Nagib Nasser. 1.Ficha técnica:

86-91 Projeto 05 Crisa Santos Construir /03/12 16:30 Page 86 REQUINTE NO INTERIOR. 86 Construir

Registration Form ALL - AMÉRICA LATINA LOGISTICA S.A. Version : 3

ICT Roadshow. Sector TIC. Bélgica e Luxemburgo 23 a 25 de maio de 2016

ED. PUERTO MADERO MEMORIAL DESCRITIVO

1/100 PLANTA DA CAVE PROJECTO DE ARQUITECTURA PROJECTO BASE DE MORADIA UNIFAMILIAR EM BANDA. LOTE 25 - QUINTA DA BOAVISTA Amareleja - Moura

Erasmus Student Work Placement

MEMORIAL DESCRITIVO ESPECIFICAÇÕES TÉCNICAS DE ACABAMENTOS VIDA VIVA CLUBE IGUATEMI MEM

APÊNDICE "D" Descrição Técnica dos Pequenos Serviços de

SÃO PAULO CLÓVIS AUGUSTO MANFIO

MEMORIAL DESCRITIVO 1 - DESCRIÇÃO GERAL:

Transcrição:

Government Characterization

www.votuporanga.sp.gov.br 2

www.votuporanga.sp.gov.br 3

Location São Paulo State Map Area 424,1 km² Density 201 hab./km² Altitude 525 m Time Zone UTC-3 Information Entity Policy Votuporanga São Paulo Brazil Closing date the head of office Executive December 31 th, 2016. Population 90.508 residents Geographic Location Southeast

Government Characterization $ Absolute GDP R$ 1.590.508.000,00 = 326.767,48 Municipality Budget to 2015 R$ 246.962.694,00 = 50.738.115,04 229.232,45 $ GDP per capita $ R$ 18.464 per person = 3.793,40 per person GDP by sector Thousands 58.196,99 5.525,95 Agricultural Industry Services www.votuporanga.sp.gov.br 5

Government Characterization Human Development Index (2010) (*) 0,79 Major Economic Activities Educational index (*) 0,744 (*) Source: PNUD Sources: IBGE and Dataviva www.votuporanga.sp.gov.br 6

Environment to PPPs There are PPPs legislation? Yes, Bylaw nº 5.518, November, 25 th, 2014 and Guarantee Fund Bylaw nº 5.519, November 25 th, 2014, Established by Ordinance nº 18.258, May 07 th, 2015. There are already signed contracts? No. 5% of Net Current Revenue R$ 10.611.186,17 = 2.180.052,28 Priority Structure Both: Expression of Interest and external consults. www.votuporanga.sp.gov.br 7

Our priority projects 1 Administrative Center 2 Smart City (focus on public lighting) 3 Solid Waste Management www.votuporanga.sp.gov.br 8

CRONOGRAM Administrative Center Feasibility Study BEGIN Feasibility Study END Public Consultation Licitation Estimated Investment Contract Model 5.155.382,50 administered grant Priority Mode Structur Situation 2014 2014 2015 2015/16 External consultants for public consultation www.votuporanga.sp.gov.br 01 02 03 04

Administrative Center 9 10 C 8 7 A Termoacus tico fl/08 6 5 fl/10 4 11 12 D 3 fl/10 2 1 132 132,00 3,55 3,00 2,70 2,40 10,34 3,00 PM 02 12 PMD 04 2,76 3,75 3,78 2,75 5,34 7,55 14,94 9,00 1,00 P19 P22 5 6 7 8 1,44 P27 2,40 1,00 1,90 1,80 1,05 2,70 3,00 1,80 12 2,30 Em 08 i h 12,35,35 P87 nto 24,00 24 06 PV 06 PV PV Ele me 2,70 ll Drywa Em na ria Alve elev. 14 19 12 22 21 20 elev. 23 27 26 25 24 02 l. h=0.90 1,85 02 1,85 1,30 P78 Pc14 Pc15 1 06 PM PM,28,28,28,28,28,28,28,28,28 13 18 17 1,44 16 15 3,80 P69 P79 Inox fl/08 f E P88 Marquize - Topo) 41,35 90,00 90 Fe cha Vidro me nto Incolor La mninaem Pe le de 10 mm do 19 2,65 variavel hl=varia hf=varia vel vel Pc13 PMC Pc12 1,30 5,00 5,70 2,95 Pc11 2,90 masc. P86 Pc 8 5,00 2,00 Pc10 l. h=0.90 06 wc. 2,00 18 P 57 P68 2,125 PV 2,65 Pc 6 Pc 7 Pc9 12,35 1,44 P67 1,75 15 09 PMCD 2,55 2,95 s 01 hf=5.50 Termoacus tico P45 P56 2.21 d PM 2,125 wc.fe m 4 Em na ria Alve 8,75,53 P66 3,72 4,00 P77 P a ra gra fo Comple II me ntada Le i r 195/2011 14,61 ll Drywa 4,00 19,61 1,05 3,50 2,80 2,00 29,78 01 Pc 5 17 P55 2 P76 P34 D 9,80 variavel hl=varia hf=varia vel vel Vidro E=10mm PM fl/10 Fe cha me nto Te mpera Em do Com P85 Reves tido Com Pc4 16 P65 75,225 3,80 3,80 Pc3 3,00 9,80 Alve 6,06 9,11 8,45,225 P 3,80 P33 2 P84 Pc2 P32 8,00 P54,225 Pc1 Inox P31 P44 6,40 reun. 6,05 3,40 1,88 8,48 P83 P74 cente r Elemento Em 12,69 2,00 1,00 2,40 4,99 almox. P53 P64 P43 rev hl=6.85 3,55 data P28 (Aluminio Compos to) Com E= 6mm Na Cor Branco 4,99 secre taria 9,90,225 s 13 12 11 10 9,28,28,28,28,28,28,28,28,28 14 15 16 17 18 19 20 21 22 23 5,22 P26 P42 9,26 votup 3,52 ll Drywa Em na ria 3,53 Vidro E=10mm 2,80 Fe cha Te mpe me nto ra do Em Com 8,68 equipa mento 23,78 Fe cha Vidro me nto Incolor LamninaEm Pe le de 10 mm do 3,00 P21 2,80 04 Fe cha Te mpe me nto rado Em Com cftv 2,00 B fl/08 Fechamento Em Vidro Laminado 2,40 P18 26,94 Fechamento Em Vidro Temperado Com E=10mm PMC 03 PMD 04 PVT 05 26,94 1,00 hl=6.85 P12 PMD 04 5 5,85 Alvenaria Em Drywall 15,73 8,75 11,75 rec. P52 P63 5,00 15 2 2,40 2,80 P73 P82 14 2,00 P11 2,85 PM 02 4,21 atendimento 11,34 atrium hf=5.50 3,52 3,50 P81 P30 13 P10 lav. h=0.90 P25 P51 P72,35 P09 3 P41 os 3.80 30,00 2,43 9,00 2,05 P17 s human 13,65 P62 12,45 7,80 11,90 8 PMC 03 elev. ll Drywa Em na ria Alve 1 2,80 direito Vidro E=10mm 1 10 15 12 20,93 6,45 d P61 P71 12,35 P80 4,80 despensa P20 pabx hl=6.85 pia 4,50 P60 1,99 pia h=0.92 prateleira l=40 vazio jardim PMD 4,50 4,50 P70 h=0.92 2,50 cozinha 1.75 JARDIM a,80 P29 2,50 P16 04 1,54 P olido Natural Branco Itaunas 7,62 PMD 6,50 P40 elev. b P59 copa 1,54 3,26 14 1,44. P50 estar 3,85 oficina a./serv. 08 2 almox 5.61 P23 11 P24 P49 13 7,04 atendimento Fe cha P15 Tempe me nto rado Em Vidro Com E=10mm P48 s 2 o 2,52,28,28,28,28,28,28,28,28,28 23,40 9 30 30,00 P58 2 4,50 arquiv 6,50 Alvenaria Em Drywall P47 1,44 3 4,70 4 5 1,93 6 7 3,00 acesso 15,73 Dos P is os S uperiores P39 P14 P06 wc feminino agencia bancaria Drywall 3,00 8 1,93 Em P38 P13 17,85 PV 07 P07 35,85 1,00,35 11,85 c,45 na ria 9,40 PMC vest. fem. P46 6,30 5,85 vest. masc 8,68 Alve E,70,70,70,70,70,70,70 P37 fl/08 3,71 2,30 cadastro fisico 3,00 1 3 17,86 desenvolvimento urbano (atendimento ao publico) 7,68 P rojeto Complementar de Es trutura 3,50 P06 2,50 P36 R1,05 1,73 1,73 3,50 17,85 P05 lav. h=0.90 3,70 3,70 l. h=0.90 l. h=0.90 P35 01 P04 wc masculino PM P03 almoxarifado 1 1 1,44 PV 07 P02 2 d 1,00 36,23 10,70 1,00 1 g ducha 1,85,98 banco 1 banco 3,50 1,48 ducha ducha 1,49 3,50 1,41 P01 ducha B fl/08 P 89 e A fl/10 20 21 22 C fl/08 nivel 3,91 LEGENDA DAS ESQUADRIAS PM 01 PM 02 CAIXILHO porta convencional 1 folha porta convencional 1 folha MATERIAL PEITORIL madeira de lei madeira de lei madeira de lei ALTURA 0.90 2.10 1.89 0.80 2.10 1.68 0.90 2.10 1.89 2.10 1.89 "in loco" 2.10 3.15 "in loco" LARGURA PROJETO REQUADRO ALTURA 2.00 2.10 4.20 0.25 madeira de lei 2.00 2.10 4.20 "in loco" 1.50 vidro temperado s erigrafado branco vidro temperado s erigrafado branco 0.60 1.90 1.14 "in loco" 0.90 1.90 1.71 "in loco" porta 1 folha (box) PEITORIL madeira de lei porta correr 2 folhas (drywall) 0.90 porta 1 folha (box) MATERIAL porta correr 2 folhas P MCD 09 vidro temperado 06 CAIXILHO P MC 08 0.17 madeira de lei porta pivotante 1 folha P V 07 ITEM 0.17 porta convencional 1 folha (draywall) PV 23 LEGENDA DAS ESQUADRIAS REQUADRO LARGURA porta de correr 1 folha P MD 04 P VT 05 0.15 arquite tura escala 1:100 ITEM P MC 03 AUTORIA AUTOR DO DOPROJETO PROJETO OBRA :AS S UNTO :LOCAL :- RRT PROLONGAMENTO DA AVENIDA CESP CADASTRO NE.11.06.09.05 prefeito VOTUPORANGA SP. 03/10 FOLHA PREFEITURA MUNICIPAL DE VOTUPORANGA 000000000 EXECUTIVO ES CALA DATA 1:100 NOVEMBRO/ 2013 Rigoroza me nte Impe rme a biliza da Ma rquize De Es trutura Com Vidro La mina do Re fle tivo ca lha ca lha Cobe rtura e m te lha s + 19,80m Aca rtona do I=5% P a re de Re ve s tida Com P a ine l De MDF - BP Ama de ira do + 17,00m 3 1,09,86 4 2,50 2,80 Ca lha 5 3,40 3 3,80,57 Inox P olido Com Vidro La mina do re fle tivo 1,79 s ole ira ma rmogla s s bra nco 3,40,86 3 + 11,90m I=5% 1,14 1,28,50 4,38 3,49 3 3,50,30,30 4 3,11 Aca rtona do 2,33 2 3,61 3,61,30 3,52,86,90 2,80 4 3,16 1,90 escala 1:100,78,50 3,40 6,80 5,42 3 1,90 0,00m 3,88 Corte C-C Aca rtona do Cobe rtura e m te lha s 16,70,52,86 3,40 3 3 5 Es qua dria s Em Aluminio P olido Com Vidro La mina do + 6,80m 3-4,025m S UBS OLO - 6,625m Cobe rtura e m te lha s Aca rtona do Cobe rtura e m te lha s I=5% Aca rtona do 4,98 4,26 3,73 Fe cha me nto Em P a ine l 3,73 4,26,50,58,34 3,73 2,00 1,73,50 1,23 1,23 I=5% 2 Aca rtona do Corte B-B escala 1:100 Cobe rtura e m te lha s I=5% Aca rtona do Aca rtona do,30,97 1,49,33 3 3,33,32 5 1,45 1,51 Em P a ine l De Aluminio Compos to (ACM) Na Cor Bra nco Com E= 6mm 3 3,33 1,55,32,32,93 3 3 6,48 6,48 6,80 6,80,93,33 4,87 4,90 1,58 6,80 0,00m 4-2m 2,77 Corte E-E,85,33 4,87 5,05 3,45 + 6,80m Fe cha me nto Em P a ine l 1,53 1,57,33 2,09 3,24 4,78 5 3,50 4,61 4,61 3,24 2,09,82 2,09,33 1,45 1,33 3,24 5,11,32 1 1 3,24 5,02 1,34 1,49,33 1,59 1,49,33 1,44 2,81 Em P a ine l De Aluminio Compos to (ACM) Na Cor Bra nco Com E= 6mm + 11,90m escala 1:100 S UBS OLO Corte E-E - 4,025m - 6,625m escala 1:100 arquite tura PROJETO RRT AUTORIA AUTOR DO DOPROJETO PROJETO OBRA :AS S UNTO :- CORTES CC / BB / EE LOCAL :- PROLONGAMENTO DA AVENIDA CESP CADASTRO NE.11.06.09.05 pre fe ito VOTUPORANGA SP. 08/10 FOLHA PREFEITURA MUNICIPAL DE VOTUPORANGA 000000000 EXECUTIVO ES CALA DATA 1:100 NOVEMBRO/ 2013 Front view Side view Executive Project Main entrance of the building. Architectural design and side cut of the project. Cut of 1st floor and the topographic analysis of the area. www.votuporanga.sp.gov.br 10

CRONOGRAM Smart City Lamp posts 16.755 units Feasibility Study BEGIN Feasibility Study END Public Consultation Licitation Estimated Investment Contract Model 9.279.688,50 administered grant Priority Mode Structur Situation 2015 2015 2015 2015/16 Expression of interest public intention prioritized www.votuporanga.sp.gov.br 01 02 03 04

Smart City www.votuporanga.sp.gov.br 13

CRONOGRAM Solid Waste Management Feasibility Study BEGIN Feasibility Study END Public Consultation Licitation Estimated Investment Contract Model 8.248.6 administered grant Priority Mode Structure Situation 2015 2015 2015 2015/16 Expression of interest public intention prioritized www.votuporanga.sp.gov.br 01 02 03 04

Solid Waste Management www.votuporanga.sp.gov.br 15

Funding What we expect from UK investors. Expertise To acquire technology Top quality products and services Long term partnership Business Opportunities (Votuporanga - Beach Head to São Paulo) www.votuporanga.sp.gov.br 16

Contacts + CONTACT NAME Tiago Vieira Caproni PHONE +55 17 99170-5151 E-MAIL tcaproni@votuporanga.sp.gov.br www.votuporanga.sp.gov.br 17