Página 1 de 6 1. SERVIÇOS PRELIMINARES.1 DECAPAGEM SUPERFICIAL COM REMOCAO ATE 500 m 235,00 M2 2,64 0,18 620,40 42,30 662,70.2 LOCACAO DE OBRA POR m2 CONSTRUIDO 235,00 M2 1,23 1,37 289,05 321,95 611,00.3 INSTALACAO PROVISORIA AGUA-RESERVAT.C/REDE ALIMENT 1,00 PT 388,21 114,78 388,21 114,78 502,99.4 ENTRADA PROVISORIA DE ENERGIA 1,00 PT 627,51 113,96 627,51 113,96 741,47 1.925,17 592,99 2.518,16 Total de SERVIÇOS PRELIMINARES 1.925,17 592,99 2.518,16 2. FUNDAÇÕES.1 ESTACA ESCAVADA-400mm(rotativa) 81,00 M 77,41 0,76 6.270,21 61,56 6.331,77.2 SAPATA CONCRETO ARMADO fck15mpa-completa 4,86 M3 681,70 264,68 3.313,06 1.286,34 4.599,40.3 VIGA BALDRAME CONCR.ARMADO fck15mpa-completa 12,07 M3 686,37 326,89 8.284,49 3.945,56 12.230,05.4 IMPERMEABILIZACAO COM HIDROASFALTO 4 DEMAOS 32,37 M2 6,35 7,63 205,55 246,98 452,53.5 ESCAVACAO MANUAL DE SOLO DE 1a. ATE 1,50m 22,86 M3 0,00 21,27 0,00 486,23 486,23 18.073,31 6.026,67 24.099,98 Total de FUNDAÇÕES 18.073,31 6.026,67 24.099,98 3. SUPRAESTRUTURA DE CONCRETO.1 PILAR CONCRETO ARMADO-ESCOR,FORMA,ARM,LANC,CURA,D. 6,09 M3 920,00 624,69 5.602,80 3.804,36 9.407,16.2 VIGA CONCRETO ARMADO-ESCOR,FORMA,ARM,LANC,CURA,DES 12,89 M3 1.103,85 495,57 14.228,63 6.387,90 20.616,53.3 LAJE TRELICADA P/ PISO, H=15CM, P/ APOIO SIMPLES, SOBRECA 245,90 M2 54,18 7,71 13.322,86 1.895,89 15.218,75.4 LAJE CONCRETO ARMADO-ESCOR 10CM ENTRADA 1,20X 2,20X0,10 0,26 M3 670,09 316,66 174,22 82,33 256,55 33.328,51 12.170,48 45.498,99 3.1. LAJES VOL.DA CAIXA DAGUA ([3,4X3,10 ) + (1,8 X3,00 )]X0,10.1 LAJE CONCRETO ARMADO-ESCOR,FORMA,ARM,LANC,CURA,DES 1,60 M3 670,09 316,66 1.072,14 506,66 1.578,80 1.072,14 506,66 1.578,80 3.2. ESTRUTURA COBERTURA RECEPÇÃO (PÉ-DIRETO 4,72).1 LAJE PRE-FABRICADA FORRO 10cm TAVELA CERAMICA(5,5X6.7) 33,40 M2 51,04 7,02 1.704,74 234,47 1.939,21.2 VIGA CONCRETO ARMADO-ESCOR,FORMA,ARM,LANC,CURA,DES 1,10 M3 1.103,85 495,57 1.214,24 545,13 1.759,37 2.918,98 779,60 3.698,58 Total de SUPRAESTRUTURA DE CONCRETO 37.319,63 13.456,74 50.776,37 4. ALVENARIAS.1 ALVENARIA TIJ.6FUROS-DE 20cm-J15mm ci-ca-ar 1:2:8 195,74 M2 34,53 24,57 6.758,90 4.809,33 11.568,23.2 ALVENARIA TIJ.6FUROS-DE 15cm-J15mm ci-ca-ar 1:2:8(FEC.RECEPÇ 14,99 M2 23,00 8,40 344,77 125,92 470,69.3 CONTRAVERGA 30X12CM 71,53 M 11,63 5,43 831,89 388,41 1.220,30 7.935,56 5.323,66 13.259,22 4.1. PAREDES INTERNAS DE VEDAÇÃO.1 PAREDE EM GESSO ACARTONADO COLOCADA 285,00 M² 80,50 0,00 22.942,50 0,00 22.942,50 22.942,50 0,00 22.942,50 Total de ALVENARIAS 30.878,06 5.323,66 36.201,72 5. COBERTURA
Página 2 de 6 5.1. Cobertura Mais Alta.1 ALVENARIA TIJ.6FUROS-DE 15cm-J15mm ci-ca-ar 1:2:8 9,76 M2 23,00 8,40 224,48 81,98 306,46.2 CINTA DE CONCRETO ARMADO 13X15 X 24,4ML 0,47 M3 1.035,00 95,20 486,45 44,74 531,19.3 CALHA CHAPA GALVANIZADA CORTE 25 5,5 ml x2 9,60 M 36,80 11,20 353,28 107,52 460,80.4 ALGEROZ CHAPA GALVANIZADA CORTE 25-FIXO ALVENARIA 12,50 M 13,80 2,74 172,50 34,25 206,75.5 CHAPUZ CHAPA GALVANIZADA CORTE 20-FIXO ALVENARIA 22,90 M 18,23 10,86 417,47 248,69 666,16.6 TUBO DE QUEDA POVC 100MM 20,00 M 21,69 7,17 433,80 143,40 577,20.7 ESTRUTURA MADEIRA ANCORADA LAJE P/TELHA FIBROCIM. 30,15 M2 16,46 6,74 496,27 203,21 699,48.8 COBERTURA COM TELHA FIBROCIMENTO 6mm 30,15 M2 15,96 3,66 481,19 110,35 591,54.9 CUMEEIRA PARA TELHA FIBROCIMENTO ONDULADA 4,80 M 27,82 2,02 133,54 9,70 143,24 3.198,98 983,84 4.182,82 5.2. Cobertura.1 ALVENARIA TIJ.6FUROS-DE 15cm-J15mm ci-ca-ar 1:2:8 41,89 M2 23,00 8,40 963,47 351,88 1.315,35.2 CINTA DE CONCRETO 13X15 (67,02 + 14,21ML):81,23ML 1,58 M3 1.035,00 95,20 1.635,30 150,42 1.785,72.3 CALHA CHAPA GALVANIZADA CORTE 25 48,10 M 36,80 11,20 1.770,08 538,72 2.308,80.4 ALGEROZ CHAPA GALVANIZADA CORTE 25-FIXO ALVENARIA 57,67 M 13,80 2,74 795,85 158,02 953,87.5 CHAPUZ CHAPA GALVANIZADA CORTE 20-FIXO ALVENARIA 75,42 M 18,23 10,86 1.374,91 819,06 2.193,97.6 ESTRUTURA MADEIRA ANCORADA LAJE P/TELHA FIBROCIM. 165,94 M2 16,46 6,74 2.731,37 1.118,44 3.849,81.7 COBERTURA COM TELHA FIBROCIMENTO 6mm 165,94 M2 15,96 3,66 2.648,40 607,34 3.255,74.8 CUMEEIRA PARA TELHA FIBROCIMENTO ONDULADA 4,95 M 27,82 2,02 137,71 10,00 147,71 12.057,09 3.753,88 15.810,97 5.3. COBERTURA ENTRADA.1 COB. EM POLICARB. COMPACTO FUMÊ 6mm C/ ESTRUTURA E CAN PLUVI 5,71 M² 337,21 26,26 1.925,47 149,94 2.075,41 1.925,47 149,94 2.075,41 Total de COBERTURA 17.181,54 4.887,66 22.069,20 6. PISOS E PAVIMENTAÇÕES.1 REATERRO MANUAL DE VALAS COM MATERIAL LOCAL(H: 60CM) 124,80 M3 0,00 8,19 0,00 1.022,11 1.022,11.2 COMPACTACAO MANUAL 211,86 M2 0,00 2,17 0,00 459,74 459,74.3 LASTRO MANUAL COM BRITA 211,86 X0,05 10,59 M3 68,77 10,91 728,27 115,54 843,81.4 CONTRAPISO CONCRETO IMPERMEAVEL-8cm-350kg ci/m3 211,86 M2 24,60 10,28 5.211,76 2.177,92 7.389,68.5 PISO CERÂMICO 30X30 C/ARGAMASSA COLANTE 211,86 M2 29,97 17,51 6.349,44 3.709,67 10.059,11.6 PISO BASALTO IRREGULAR -arg.ci-ar 1:4-3cmC/ RAMPA DE ACESSO 15,00 M2 78,69 10,79 1.180,35 161,85 1.342,20.7 RODAPE CERAMICO 7,00cmx16-arg.ci-ar 1:4-1cm 260,93 M 4,83 3,92 1.260,29 1.022,85 2.283,14.8 LASTRO MANUAL COM BRITA PARA CALÇADA 70,93X0,05 3,54 M3 51,04 101,18 180,68 358,18 538,86.9 CALCADA LAJE GRES QUADROS DE 100x100cm-LEITO AREIA 7cm C/RE 70,93 M2 20,73 10,79 PERIMETRO DO PREDIO 1.470,38 765,33 2.235,71 16.381,17 9.793,19 26.174,36 Total de PISOS E PAVIMENTAÇÕES 16.381,17 9.793,19 26.174,36 7. INSTALAÇÕES HIDROSSANITÁRIAS
Página 3 de 6.1 BACIA SANITARIA COM CX DESCARGA ACOPLADA E ASSENTO 6,00 UN 195,50 39,20 1.173,00 235,20 1.408,20.2 CAVALETE ENTRADA TUBO GALVANIZADO 20mm(3/4") 1,00 UN 267,36 86,08 267,36 86,08 353,44.3 LAVATÓRIO INFANTIL C/ COLUNA 1,00 UN 251,68 21,52 251,68 21,52 273,20.4 LAVATORIO DE LOUCA C COLUNA 7,00 UN 379,50 21,52 2.656,50 150,64 2.807,14.5 CUBA REDONDA DE LOUÇA PARA TAMPO-EMBUTIR 3,00 UN 183,93 21,52 551,79 64,56 616,35.6 CUBA DE INOX QUADRADA PARA EMBUTIR EMTAMPODE GRANITO 6,00 UN 159,22 13,78 955,32 82,68 1.038,00.7 PAPELEIRA CROMADA 6,00 UN 19,45 10,79 116,70 64,74 181,44.8 SABONETEIRA CROMADA 6,00 UN 14,04 2,17 84,24 13,02 97,26.9 Dispenser para sabonete líquido com reservatório 5,00 UN 51,75 11,46 258,75 57,30 316,05.10 Dispenser tipo toalheiro plástico com alavanca 5,00 un 112,70 5,94 563,50 29,70 593,20.11 CAIXA INSPECAO 50x50x50cm ALV.15 C/TAMPA CONCRETO 8,00 UN 62,49 107,90 499,92 863,20 1.363,12.12 CAIXA GORDURA PVC 250X185X50 C/TAMPA 1,00 UN 34,73 6,16 34,73 6,16 40,89.13 RALO SIFONADO SAIDA LISA C/GRELHA 100x40 saida40mm 10,00 UN 4,84 4,29 48,40 42,90 91,30.14 RASGO EM ALVENARIA P/CANALIZACOES C/ENCHIMENTO 85,00 M 1,16 4,75 98,60 403,75 502,35.15 RASGO EM CONCRETO P/CANALIZACOES C/ENCHIMENTO 45,23 M 1,72 11,85 77,80 535,98 613,78.16 TORNEIRA GIRATÓRIA 1,00 UN 32,89 18,49 32,89 18,49 51,38.17 TORNEIRA CROM. AUTOMÁTICA C/ TEMPORIZADOR LAV. 15,00 UN 170,78 16,80 2.561,70 252,00 2.813,70.18 PONTO HID. PARA BEBEDOURO NA RECEPÇÃO 1,00 UN 29,39 9,59 29,39 9,59 38,98.19 TORNEIRA ELETRICA CROMADA AUTOMATICA 1,00 UN 143,52 14,35 143,52 14,35 157,87.20 TUBO PVC RIGIDO 100mm ESGOTO PRIMARIO 48,23 M 21,69 7,17 1.046,11 345,81 1.391,92.21 TUBO PVC RIGIDO 75mm VENTILAÇÃO 14,00 M 18,23 5,73 255,22 80,22 335,44.22 TUBO PVC RIGIDO 50mm ESGOTO PRIMARIO 38,23 M 15,15 4,29 579,18 164,01 743,19.23 TUBO PVC RIGIDO SOLDAVEL 25mm 85,00 M 2,99 2,15 254,15 182,75 436,90.24 TUBO PVC RIGIDO SOLDAVEL 32mm 42,00 M 6,26 2,88 262,92 120,96 383,88.25 TE 90 PVC RIGIDO SOLDAVEL 25mm 10,00 UN 1,70 2,88 17,00 28,80 45,80.26 TE 90 RIGIDO SOLDAVEL 32mm 12,00 UN 2,84 3,58 34,08 42,96 77,04.27 TE 90 PVC RIGIDO SOLDAVEL 40mm ESG.SEC. 9,00 UN 2,20 5,73 19,80 51,57 71,37.28 TE 90 PVC RIGIDO SOLDAVEL 75mm 10,00 UN 31,99 5,73 319,90 57,30 377,20.29 JOELHO 90 PVC RIGIDO SOLDAVEL 75mm 4,00 UN 47,91 5,73 191,64 22,92 214,56.30 JOELHO 90 PVC RIGIDO SOLDAVEL 40mm 8,00 UN 3,86 4,29 30,88 34,32 65,20.31 JOELHO 90 PVC RIGIDO ESGOTO 100MM 6,00 UN 5,21 7,73 31,26 46,38 77,64.32 REDUCAO PVC JE PB 100x75 4,00 UN 17,36 5,03 69,44 20,12 89,56.33 JUNÇÃO DE 45 PVC SIMPLES DE 100mmx50mm 4,00 UN 11,18 15,46 44,72 61,84 106,56.34 JUNÇÃO DE 45 SIMPLES PVC ESGOTO 50mmx50mm 5,00 UN 6,66 15,46 33,30 77,30 110,60.35 CONJ. FOSSA E FILTRO ANAERÓBIO 4000LT EM FIBRA DE VIDRO 1,00 CJ 2.702,50 504,00 2.702,50 504,00 3.206,50
Página 4 de 6.36 SUMIDOURO (V=12M3) (50 A 60 PESSOAS) 1,00 UN 850,40 641,66 850,40 641,66 1.492,06 17.148,29 5.434,78 22.583,07 Total de INSTALAÇÕES HIDROSSANITÁRIAS 17.148,29 5.434,78 22.583,07 8. INSTALAÇÕES ELÉTRICAS.1 ENTRADA DE LUZ TRIFÁSICA C/POSTE E MURETA PINTADA 1,00 UN 1.082,05 131,06 1.082,05 131,06 1.213,11.2 HASTE COOPERWELD 19x2400mm C/CONECTOR 1,00 UN 27,48 14,25 27,48 14,25 41,73.3 ARANDELA PARA PAREDE-COM LAMPADA INCANDESCENTE 60w 8,00 UN 15,18 7,12 121,44 56,96 178,40.4 ARANDELA PARA TETO-COM LAMPADA INCANDESCENTE 60w 15,00 UN 15,18 8,53 227,70 127,95 355,65.5 LUMINARIA FLUORESCENTE 2x40w COMPLETA 20,00 UN 51,04 17,08 1.020,80 341,60 1.362,40.6 INTERRUPTOR EMBUTIR SIMPLES-INCLUSIVE CAIXA 2x4" 29,00 UN 7,31 5,71 211,99 165,59 377,58.7 INTERRUPTOR EMBUTIR DUPLO-INCLUSIVE CAIXA 2x4" 2,00 UN 9,65 6,42 19,30 12,84 32,14.8 TOMADA P/TELEFONE C/CAIXA 5,00 UN 12,70 12,17 63,50 60,85 124,35.9 TOMADA 5000W 1,00 UN 9,28 12,17 9,28 12,17 21,45.10 TOMADA PISO SIMPLES-INCLUSIVE CAIXA ALUMINIO 2x4"ODONTO 1,00 UN 34,11 8,53 34,11 8,53 42,64.11 TOMADA P/COMPUTADOR C/CAIXA 3,00 UN 5,89 12,17 17,67 36,51 54,18.12 TOMADA EMBUTIR SIMPLES-INCLUSIVE CAIXA 2x4" 42,00 UN 7,14 5,71 299,88 239,82 539,70.13 ELETRODUTO PVC RIGIDO ROSCAVEL 3/4" (19mm) 300,00 M 1,05 4,29 315,00 1.287,00 1.602,00.14 FIO ISOLADO 2,5mm2 (12AWG) 350,00 M 0,95 1,85 332,50 647,50 980,00.15 FIO ISOLADO 6,0mm2 (8AWG) 250,00 M 2,58 1,41 645,00 352,50 997,50.16 FIO TELEFONE 60,00 M 0,25 0,76 15,00 45,60 60,60.17 FIO ISOLADO 16mm2 ( 4AWG) 15,00 M 7,21 2,83 108,15 42,45 150,60 4.550,85 3.583,18 8.134,03 Total de INSTALAÇÕES ELÉTRICAS 4.550,85 3.583,18 8.134,03 9. ESQUADRIAS.1 PORTA INT.SEMI-OCA COMPENS.CANELA S/FERR.0,80X2,10 17,00 CJ 224,25 37,59 3.812,25 639,03 4.451,28.2 PORTA INT.SEMI-OCA COMPENS.CEDRO S/FERR.0,75x2,10 1,00 CJ 218,50 33,60 218,50 33,60 252,10.3 PORTA INT.SEMI-OCA COMPENS.CEDRO S/FERR.0,70x2,10 3,00 CJ 198,38 61,98 595,14 185,94 781,08.4 PORTA INT.SEMI-OCA.CEDRO S/FERR.0,60x2,10 -CORRER 1,00 CJ 533,73 43,04 533,73 43,04 576,77.5 PORTA VENEZIANA FERRO-REFORÇADA(02 UNIDADES) 2,94 M2 283,15 22,60 832,46 66,44 898,90.6 PORTA DE ABRIR EM ALUMÍNIO ANODIZADO C/ VIDRO(ENT. REUNIÕES) 3,78 M2 368,00 24,77 1.391,04 93,63 1.484,67.7 PORTA DE VIDRO TEMP 180X210 - ENTRADA PRINCI 1,00 un 782,00 59,62 782,00 59,62 841,62.8 FERRAGEM COMPLETA PARA PORTA INTERNA 22,00 CJ 82,56 26,98 1.816,32 593,56 2.409,88.9 FERRAGEM COMPLETA PARA PORTA EXTERNA(ACESSO E SALA DE REUNIÕ 2,00 CJ 154,90 26,98 309,80 53,96 363,76.10 FERRAGEM COMPLETA P/PORTA EXTERNA VENEZIANA 2,00 UN 64,40 30,41 128,80 60,82 189,62.11 PORTA EM MDF CINZA 0,60X1,60(20CM DO PISO) C/TRANQUETA CROM. 2,00 UN 115,00 17,06 230,00 34,12 264,12.12 ESQ. DE ALUMÍNIO ANODIZADO BRONZE MAXIM-AR C/ BANDEIRA FIXA 32,52 M² 402,50 28,00 13.089,30 910,56 13.999,86
Página 5 de 6.13 ESQUADRIA DE ALUMÍNIO ANOD BRONZE ALUMÍNIO VIDRO ( CAIXILHO 7,61 M2 395,60 4,39 3.010,52 33,41 3.043,93.14 VIDRO TRANSPARENTE 4mm COLOCADO COM TUBO DE PVC 40,13 M2 46,00 25,26 1.845,98 1.013,68 2.859,66.15 PEITORIL DE GRANITO CINZA 15cm-arg ci-ar 1:5-3cm 36,40+9ML 45,40 M 38,52 9,70 1.748,81 440,38 2.189,19.16 SOLEIRA GRANITO CINZA 15cm-arg.ci-ar 1:4-3cm 5,60 M 57,88 9,70 324,13 54,32 378,45.17 Tijolos de vidro 80,00 un 10,24 2,02 819,20 161,60 980,80 31.487,98 4.477,71 35.965,69 9.1. PINTURA DAS PORTAS.1 LIXAMENTO MADEIRA-LIXA GROSSA E FINA 1,00 M2 0,38 6,16 0,38 6,16 6,54.2 SELADOR S/MADEIRA 1 DEMAO 68,80 M2 3,48 4,77 239,42 328,18 567,60.3 PINTURA ESMALTE BRILH. S/MADEIRA - 2 DEMAOS 68,80 M2 5,21 6,09 358,45 418,99 777,44 598,25 753,33 1.351,58 Total de ESQUADRIAS 32.086,23 5.231,04 37.317,27 10. REVESTIMENTOS.1 CHAPISCO ci-ar 1:5-7mm PREPARO E APLICACAO 1.110,30 M2 0,58 2,69 643,97 2.986,71 3.630,68.2 EMBOCO ARGAMASSA REGULAR ca-ar 1:5+ 7%ci-10mm(int) 1.110,30 M2 1,09 7,30 1.210,23 8.105,19 9.315,42.3 REBOCO ARGAMASSA FINA ca-af 1:3+ 5%ci-7mm(externo) 991,06 M2 0,75 6,50 743,30 6.441,89 7.185,19.4 PASTILHA ESMALTADA 10 x 10 cm ARGM. COLANTE C/ REJUNTE 119,24 M2 59,46 5,38 7.090,01 641,51 7.731,52 9.687,51 18.175,30 27.862,81 Total de REVESTIMENTOS 9.687,51 18.175,30 27.862,81 11. PINTURAS 11.1. PINTURAS EXTERNAS.1 SELADOR PARA PAREDES INTERNAS/EXTERNAS 1 DEMAO 231,11 M2 1,32 2,13 305,07 492,26 797,33.2 PINTURA ACRILICA SOBRE REBOCO-2 DEMAOS 231,11 M2 3,88 6,36 896,71 1.469,86 2.366,57 1.201,78 1.962,12 3.163,90 11.2. PINTURAS INTERNAS.1 MASSA CORRIDA PVA PARA INTERIORES 2 DEMAOS 811,17 M2 4,37 3,25 3.544,81 2.636,30 6.181,11.2 SELADOR PARA PAREDES INTERNAS 1 DEMAO 811,17 M2 1,32 2,13 1.070,74 1.727,79 2.798,53.3 PINTURA ESMALTE BRILHANTE SOBRE REBOCO-2 DEMAOS 811,17 M2 4,77 4,77 3.869,28 3.869,28 7.738,56 8.484,83 8.233,37 16.718,20 11.2.1. FORRO DA LAJE.1 SELADOR PARA PAREDES INTERNAS 1 DEMAO 269,98 M2 1,32 2,13 356,37 575,06 931,43.2 PINTURA ACRILICA SOBRE REBOCO-2 DEMAOS 269,98 M2 3,88 6,36 1.047,52 1.717,07 2.764,59 1.403,89 2.292,13 3.696,02 Total de PINTURAS 11.090,50 12.487,62 23.578,12 12. EQUIPAMENTOS.1 BARRAS CROMADAS PARA APOIO DE DEFICIENTE 4,00 UN 71,30 8,96 285,20 35,84 321,04.2 BALCÃO EM MDF 160X50X90CM( CXLXA) - SALA DE IMUNIZAÇÃO 1,00 UN 672,75 207,46 672,75 207,46 880,21.3 BALCÃO EM MDF 180X45X90CM( CXLXA) - 1,00 UN 690,00 168,00 690,00 168,00 858,00.4 BALCÃO EM MDF em L "1,85+1,37X50X90CM( CXLXA) - sala de est. 1,00 UN 902,75 207,46 902,75 207,46 1.110,21
Página 6 de 6.5 BALCÃO EM MDF 1,40X0,50X0,0,90 1,00 UN 402,51 207,46 402,51 207,46 609,97.6 BALCÃO EM MDF 1,X0,50X0,90 3,00 UN 442,75 207,46 1.328,25 622,38 1.950,63.7 BALCÃO EM MDF 125X50X90CM( CXLXA) - 3,00 UN 517,50 207,46 1.552,50 622,38 2.174,88.8 BALCÃO DE ATENDMENTO h: 1,20 + BALCÃO PARA PC H: 0,75 1,00 UN 805,00 224,00 805,00 224,00 1.029,00.9 RODATAMPO H 7CM E=2CM 19,07 ML 37,03 5,87 706,16 111,94 818,10.10 SAIA DE GRANITO PARA TAMPO H=5CM 15,48 ML 34,66 4,74 536,54 73,38 609,92.11 TAMPO GRANITO E=2CM COLOCADO 7,40 M2 299,00 15,15 2.212,60 112,11 2.324,71.12 DIV. DE GRANITO E=3CM CINZA H=1.90M FIX C/ PAR. SEX. CROM 5,18 M² 316,25 29,12 1.638,18 150,84 1.789,02.13 EXTINTOR DE INCENDIO AGUA COM SUPORTE-10Kg 2,00 UN 101,20 5,28 202,40 10,56 212,96.14 EXTINTOR DE INCENDIO CO COM SUPORTE-6Kg 2,00 UN 454,25 5,28 908,50 10,56 919,06 12.843,34 2.764,37 15.607,71 Total de EQUIPAMENTOS 12.843,34 2.764,37 15.607,71 13. FECHAMENTO DO TERRENO.1 ESC. MANUAL DE SOLO DE 1a. ATE 1,50m - 40 MOURÕES X0,25X0,25 1,25 M3 0,00 21,27 0,00 26,59 26,59.2 CERCA DE TELA 2" COM MOURAO DE CONCRETO 119,00 M 40,25 18,94 4.789,75 2.253,86 7.043,61.3 PORTÃO FERRO 3/8" 2FOLHAS 2,00X2,00 COLOCADO 4,00 M2 71,88 0,00 287,52 0,00 287,52.4 CALCADA LAJE GRES -LEITO AREIA 7cm C/REJ. 121,00 M2 20,73 10,79 2.508,33 1.305,59 3.813,92.5 RAMPA DE ACESSIBILIDADE EM CONCRE TO CONF. NBR 9050 1,00 UN 544,35 207,20 544,35 207,20 751,55 8.129,95 3.793,24 11.923,19 Total de FECHAMENTO DO TERRENO 8.129,95 3.793,24 11.923,19 14. SERVIÇOS FINAIS.1 LIMPEZA DA OBRA 235,00 M2 0,00 1,85 0,00 434,75 434,75.2 PLACA DE INAUGURAÇÃO DE BRONZE 1,00 UN 286,07 18,89 286,07 18,89 304,96 286,07 453,64 739,71 Total de SERVIÇOS FINAIS 286,07 453,64 739,71 Total do Orçamento 217.581,62 92.004,08 309.585,70